Rock Wool Sandwich Panel Continuous Production Line
Rock Wool Sandwich Panel Continuous Production Line
Rock Wool Sandwich Panel Continuous Production Line
Rock Wool Sandwich Panel Continuous Production Line
Rock Wool Sandwich Panel Continuous Production Line

1 / 3

Rock Wool Sandwich Panel Continuous Production Line

Get Latest Price
Send Inquiry
Model No. : 950 and 980
Brand Name : Tianyu
10yrs

Cangzhou, Hebei, China

Visit The Store
  • Platform Certification
  • Video

Product description

Rock Wool Sandwich Panel Continuous Production Line

Roll Forming Machine Production Line Process Flowchart


Rock Wool Sandwich Panel For Roof Panel and Wall Panel

Tongue-and-Groove Type Rock Wool Sandwich Panel for Wall Panel

Lapped Type EPS Sandwich Panel for Roof Panel

Rock Wool Sandwich Panel Roll Forming Machine Technical Parameter

1.Suitable To Process steel plate,EPS or rock wool
2.The Width of Raw Material 1200mm
3.Formed Width 950mm and 980mm
4.Thickness 40-320mm
5.Roller Stations

upper layer : 14 rows

down layer : 13 rows

6.Machine Dimensions

Decoiler Width:1000mm

Forming Machine:upper layer 7000*1520*1500(Length*Width*Height)

down layer 6500*1520*1500(Length*Width*Height)

Feeding Device:5.1mm

Composite Forming Machine:8100*2230*2400mm(Length*Width*Height)

Sheet Cutting Device:3.18m

Receiving Table:6m

Press Gap Device:2000*400*800(Length*Width*Height)

Sealing Side Box(two sets):800*500*500(Length*Width*Height)

7.Requirement of Workshop 45m*7m*6m(Length*Width*Height)
8.Total Power 32KW
9.Voltage 380V 50HZ 3Phase
10.Productivity 4-5m/min

Rock Wool Sandwich Panel Roll Forming Machine Packing

1.Tighten to container with steel wire rope and welded machine with container by angel iron.

2.Main forming machine and decoiler is naked(If you need,we can also packed with water-proof plastic).

3.PLC control systerm and motor pump are packed with water proof paper coverage

Rock Wool Sandwich Panel Roll Forming Machine Loading Need one 40' High Cube Container and one 40' Open Top Container

Installation&Commissioning

One or two engineers will be assigned for the installation,commissioning and training for the maximum duration of 15 working days,the cost are invoiced separately on basis of the payment conditions and travel expenses valid at that time.The buyer had to take care for the pre-installation and commissioning preparations before arrival of seller's technicians at the buyer's factory site.

Warranty

12 months,starting from the date of acceptance and turnover by the buyer.

We hope that the information,terms and conditions above mentioned are in according to your requirements.In case you have further questions or clarifications,pls feel free to consult us for further explanations.

Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628