1 / 5
Model No. : | HW80-450 |
---|---|
Brand Name : | LH |
Motor Type : | AC Motor |
Jining, Shandong, China
Product description
Rock Demolition machine hydraulic stone splitter price
The working principle of hydraulic rock splitter:
Step 1:hydraulic stone splitter drill the hole of the corresponding diameter and depth on the object that needs to be split,
and insert the block group (one middle block and two reverse blocks) into the drilled air.
Step 2: The middle block moves forward before the two reverse blocks by hydraulic pressure and pushes them outwards with a splitting force of up to 400 tons.The split object is in a few seconds. Cracks can be produced inside
Step 3: Hammer to Break Rocks Use the enlarged gasket to split the split body again to widen the split crack.rock splitting machine
The main performance of hydraulic rock splitter: no vibration, no impact, no noise, no dust, can complete splitting in a few seconds, high work efficiency, controllable splitting, accurate split size, moderate weight, simple operation, convenient maintenance,Demolition work indoors and in narrow spaces.
Rock splitter hydraulic:
Packing&Shipping:
FAQ:
1.Are you factory?
A: We are factory and trading company,we are professional manufacturer of solar pile driver ,Highway guardrail pile driver,Hydraulic water well drilling rig,Pneumatic water well drilling rig etc.
2.What brand of the machinery can we supply?
3.What kind terms of payment can be accepted?
4.What about the warranty time?
5.How long is your delivery time?
6.Our after services:
7.Shipping way
By air or by sea as you required.
Model
HW-250
HW-350
HW-450
Power
Diesel Power Pack
Diesel Power Pack
Changchai 6hp or 8hp
Hydraulic Power Unit
Pressure Adjustable 10~60Mpa
Splitter Length (mm)
1000
1100
1200
Wedge Length (mm)
250
350
450
Wedge Weight (kg)
30
36
43
Piston Stroke (mm)
90/220
90/220
90/220
Drilling Depth (mm)
>500
>700
>900
Drilling Diameter (mm)
42
50
55
Crack Width (mm)
10-20
10-20
10-20
Splitting Time (s)
10-15
10-15
10-15
Splitting Force (T)
800
900
1000
A: HW, Sem, XCMG, ZGYX brand etc.
A:Normally we can work on T/T term or L/C term.
A:12 months after shipment, excluding wearing parts, We offer these parts with lowest price at any time.
A: Generally it is 7-14 days if the goods are in stock or it is 15-25 days if the goods are not in stock, it is according to quantity.
Our sales team will response for your question within 24 hours. (Holidays Excluded)
Technical support will be available at any time.
Free replacement will provide once the failure confirmed caused by our product quality.
Jining, Shandong, China
Send your inquiry to this supplier