1 / 1
Model No. : | DT-chair-1015 |
---|---|
Brand Name : | DT |
Product description
Product Name | plastic chair rail mold moulding |
Core &Cavity Steel | P20,718H,2738H, H13, NAK80,2316 etc. |
Mould base & Standard Component | DME,HASCO,Self-made etc. |
Steel hardness: | HRC35-38 |
Plastic material | PP,PC,PE,ABS,PVC etc. |
Cavity Number | Single,or by your request |
Injection System | Side Gate |
Ejector System | Ejector Pin |
Cycle Time | 30-60S |
Tooling lead time | 45-60 Days |
Mould life | 500,000 Shots |
Quality assurance | ISO9001 |
Our Advantage | 1.High quality |
2.Reasonable price | |
3.On time delivery | |
4.Good After-sale service | |
5.Strict quality control | |
6.All the mould are automotic. | |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule | |
In-time mould test and sample delivery | |
In-time mould delivery. | |
For more information please contact us. |
Main Technique Parameters | |
Cavity/Core Material | 718H, P20, 2738H,NAK80, 2316 |
Product Material | ABS, PC, PP, PVC, POM, PMMA, PS, PE, PET, Rubber, Silicone, PA, PBT, PEI, etc. |
Base | LKM or by requested |
Structure | Double color injection mould, Solid Mould, Insert Mould, Mould with Slide, Mould with Lifter |
Runner System | Hot runner, Cold runner |
Cavity | Single cavity, multi cavity by requested |
Finish | Corrosion word, Mirror finish, Brushed |
Longevity | 500,000SHOTS |
Mould standard | HASCO, DME, MISUMI, or by requested etc. |
Software | CAD, Pro-E, UG, etc |
Tolerance | ± 0.02mm |
Design Time | 3-7days |
Sample time | 3-7days |
Main Technique | Milling, Grinding, EDM, Wire-cutting, Engraving, CNC, and 2.5 Dimension test, etc. |
Production time | 2-7 weeks, depends on mould structure |
Packing | Wooden case, PE, or by request |
1. Inquiry | Customer sends us sample or drawings | |
↓ | ||
3. Place an order | Customer confirms the steel, machine spec, plastic material. delivery time, payment item,special requirement ect. | |
↓ | ||
4. Mould Design | on the basis of confirmed order | |
↓ | ||
5. Mold Tooling | start after mold design confirmed, Cut steel, CNC machining, polishing, sampling | |
↓ | ||
6. Mold Process | Mould process photos update to customers each week | |
↓ | ||
7. Sample shoot | T0 - T1: Checking if mould running corrects, the dimension, weight, wall thickness meet customer’s request, if all ok, arrange samples for your approval. | |
↓ | ||
8. Delivery time | Once sample approved, ship the moulds in 7 days | |
↓ | ||
9. Shipping | By Sea: Nearest port-Ningbo/Shanghai | By air: Nearest airport-Shanghai/Hangzhou |
1. DT Mould advise suitable steel to meet your output production demand |
2. High speed performance |
3. Air venting solution in the container's handle area |
4. Prompt reply Plus professional communication |
5. Strict quality control |
6. On time delivery |
7. Good After-sale service Two-year after-sale technique support (2 Scheme) |
Contact Info: | |
Gorden Zhang | Skype: gordenzhang80 |
Tel:+86 13516866176 | gordenzhang(at)hotmail.com gordenzhang(at)diantemould.cn |
Send your inquiry to this supplier