Passed CE and ISO YTSING-YD-7278 Aluminum Rain Gutter Rollformer Manufacturer/Supplier
Passed CE and ISO YTSING-YD-7278 Aluminum Rain Gutter Rollformer Manufacturer/Supplier
Passed CE and ISO YTSING-YD-7278 Aluminum Rain Gutter Rollformer Manufacturer/Supplier
Passed CE and ISO YTSING-YD-7278 Aluminum Rain Gutter Rollformer Manufacturer/Supplier
Passed CE and ISO YTSING-YD-7278 Aluminum Rain Gutter Rollformer Manufacturer/Supplier
Passed CE and ISO YTSING-YD-7278 Aluminum Rain Gutter Rollformer Manufacturer/Supplier
Passed CE and ISO YTSING-YD-7278 Aluminum Rain Gutter Rollformer Manufacturer/Supplier
Passed CE and ISO YTSING-YD-7278 Aluminum Rain Gutter Rollformer Manufacturer/Supplier

1 / 6

Passed CE and ISO YTSING-YD-7278 Aluminum Rain Gutter Rollformer Manufacturer/Supplier

Get Latest Price
Send Inquiry
Model No. : YD-7278
Brand Name : YTSING
9yrs

Wuxi, Jiangsu, China

Visit The Store

Product description

        Passed CE and ISO YTSING-YD-7278 Aluminum Rain Gutter Rollformer Manufacturer/Supplier             
 Profile drawings for your reference         We can design the machine and flow chart according to your specific profile drawing.           Specifications  
Specification
Number of Stations 18 sets(according to profile drawing)
Main Power 7.5kw
Thickness of coil 0.5-0.9mm
Material of coil CR12, CNC lathesquenched 58-62
Max weight of coil 3000kg
Width of coil 300mm
Shipment Packing one 40FT container
Forming Speed 15m/min(Not including cutting)
Machine Frame H-BEAM Frame
 
Technical Data
Man Power Required One operator with one assinstant
Set Up time 15 mins
Working Hours per Day 8 to 16
Line Direction Left to Right While Facing Operator Panel
 
Complete Line Consist Of
Decoiler
Infeeding Applicator
Roll Forming Unit
Hydraulic Notch/Punch
Hydraulic Cutting
Output Table
            Flow Chart             Details of machine                           Samples             About our factory                 Payment terms and after-sale service     PAYMENT   30% paid by TT in advance and the balance paid by TT before shipping   AFTER SALE SERVICE   - The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. - Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. - Training time: 5 days. - Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. -The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)   We welcome you to visit our factory and hope the cooperation with you sincerely!   C Purlin Roll Forming Machine, Steel c channel making machine C Purlin Roll Forming Machine, Steel c channel making machine
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628