Molding injection polypropylene plastic chair
Molding injection polypropylene plastic chair
Molding injection polypropylene plastic chair

1 / 1

Molding injection polypropylene plastic chair

Get Latest Price
Send Inquiry
Model No. : CH-2015-N-00161
Brand Name : CH MOULD

Product description

Molding injection polypropylene plastic chair Company Information   Taizhou Huangyan Chenhang Mould Factory, established in the year of 2004, is a professional company engaged in mould design, manufacturing & producing. We are specialized in plastic mould, injection mould, commodity mould, kitchenware mould, auto and motorcycle parts mould, SMC moulds,etc. We had introduced High Speed CNC Centre, Slow-feeding NC wire cut machine, Deep hole drilling machine,EDM, Wire cutting machine, Grinding  machine, Latheing machine etc, all these advanced equipments ensure good quality moulds with short delivery.   Product Description  

Product Name

 Molding injection polypropylene plastic chair 

Product material

PP

Core& Cavity Steel

P20

Steel hardness:

HRC34

Mould Base

S55C, C45#

Cavity Number

1

Injection System

points gate, Hot runner

Ejector System

ejector pins and hydraulic

Cycle Time

40 second/shot

Tooling lead time

50 days

Mould life

600, 000 times



Why Choose us ??

Because we have those advantage

1. We are moulds manufacturers

2. Competitive price

3. High mould quality with guaranteed

4. On time delivery

5. Strict quality control

6. All the mould produced follow on customers’ requirements

 

We can offer you

Professional & detailed response

In time complete quotation

Professional and integrity designs & drawings

Mold flow analysis report

Once a week mould process machining

In-time mould test and sample delivery

 

      Our Services   Chenhang Mould Quality Control for Molding injection polypropylene plastic chair   
    1.Mould Material Q/C   1) mould steel checking (hardness,flaw detection) 2) mould spare parts checking (hardness,size)   2.Mould Making Process Q/C   1) design checking ( part design,mould desig,mould enginering drawing) 2) mould size checking (according to drawing) 3) mould testing (check mould working,sample)   Packaging & Shipping  

Packaging Detail

The moulds covered with anticorrosive oil inside and plastic film outside.

Final packed in wooden case.Or we can follow you to make your own special package

Delivery Detail

55 days ( 40 days mold finished then free 3 times to test mold )

  FAQ   Chenhang Mould Operating Steps   1.Unscrew the bolt to take down the Connection Block. 2.The cooling channel connected by Diffluent Block.       Contact Us   Our location on map     The time cost from other city to our factory:  1.From Ningbo by train take around 1 hour.  2.From Yiwu by bus take around 3 hours. 3.From Shanghai by train take around 4 hours. 4.From Guangzhou by airplane take around 2 hours.   Please feel free to contact with us if you have any inquiry for Molding injection polypropylene plastic chair . Thank you !  
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628