1 / 6
$1000.00
≥50 Bag/Bags
$800.00
≥100 Bag/Bags
Model No. : | M-78 |
---|---|
Brand Name : | FUTAO |
Structure : | Single Tube Tower |
Wuxi, Jiangsu, China
Product description
Modern Techniques Hot Selling Transmission Telecom Pole
Company Information
Yixing Futao Metal Structural Unit Co. Ltd is located in No.8 Nanxin East Road, Heqiao Town, Yixing City, Jiangsu Province.Equipped with a series of numerical control conveyor systems of flattening, cutting, folding and auto-welding, we could manufacture high & medium mast lighting, road lighting power poles, sight lamps, courtyard lamps, lawn lamps, traffic signal poles, monitor poles, microwave communication poles etc.Moreover,Our manufacturing process has been ISO9001 certified.Therefore,we own a large-sized numerical control hydraulic pressure folding machine with once folding length 13,000mm and the thickness 2-20mm.
we have been honored with the title of the AAA grade certificate of goodwill".In 2015 we have owned 27 Transactions for more than US $1,300,000 in the latest 12 months.
Product Description
Available height:5-80m
Material:Q345B/A572,minimum yield strength>=345MPA,
Q235B/A36,minimum yield strength>=235MPA
Galvanized:Hot dip galvanization,thickness is>=86um
Delivery lead time:30 days after receiving 30% deposit
Lifetime:Minimum 25 years
Structure:Overlap connection/Flange connection
Galvanizing standard:EN ISO 146,ASTM/A123
Manufacturing and workmanship:BS449 or AISC
Welding standard:BSEN287,BSEN288 or equivalent
Packaging & Shipping
Our communication monopole pole antenna wifi modern tower as normal cover by Mat or straw bale at the top and bottom ,anyway also can following by client required , each 40HC or OT can loading how many pcs will calculation base on the client actually specification and data.
Inspection
To assure our products qualified , we take steps as follows :
1. Management team : We have employed the experienced senior experts to take charge of the whole management ,especially the technical management and quality management .
2.Introducing ISO management :We are aware of ISO 9001:2008 certificate .
3.QC Inspection :It is our company policy that all the finished products should be inspected by our specialized QC in every manufacture step and before each
Packaging & Shipping
Our poles as normal cover by Mat or straw bale at the top and bottom ,anyway also can following by client required , each 40HC or O/T can loading how many pcs will calculation base on the client actually specification and data.
FAQ
Payment:
(1)Telegraphic Transfer:30% advance payment, balance before shipment .
(2)Telegraphic Transfer:30% advance payment, balance against copy of documents.
(3)Letter of Credit: at sight.
2. Lead Time: 2 weeks after confirmed order.
3. Delivery way: by sea.
Wuxi, Jiangsu, China
Send your inquiry to this supplier