1 / 5
Model No. : | LB2000 |
---|---|
Brand Name : | others |
Type : | Asphalt Mixing Plant |
Harbin, Heilongjiang, China
Product description
Asphalt Batch Drum Mixer Plant Speco
• Cost effective solutions for your project
• Low maintenance operation & Low energy consumption & Low emission
• Optional environmental design - sheeting and clad to customers requirements
• Multi-fuel burner for choose
Name | Technical Parameters | |||
Type | QLB-600 | QLB-1000 | QLB-1500 | QLB-2000 |
Production capacity | 48t/h | 80t/h | 120t/h | 160t/h |
Volume of cold aggregate bin | 8m³/3 | 9m³/3 | 10m³/4 | 10m³/5 |
Dust collect type | Air back flush/wet dust collect | |||
Dust collect efficiency | ≤30mg/Nm³ Ringelmann scale level 1 | |||
Fuel type | Diesel /Heavy diesel /Coal power/Gas | |||
Volume/number of hot bin | 12t/4 | 32t/4or5 | 40/4or5 | 50t/5 |
Measuring accuracy of aggregate | <+1.5% | <+1.0% | ||
Measuring accuracy of filier | <+1.5% | <+1.0% | ||
Measuring accuracy of bitumen | <+0.5% | |||
Mixing capacity kg/batch | 600 | 1000 | 1500 | 2000 |
Volume / number of asphalt tank | 10m³/2 | 10m³/2 | 30m³/2 | 50m³/2 |
Finished bin volume (t) | 60 | 100 | 120 | |
Total power(kw) | 185 | 248 | 345 | 470 |
Control system | Full auto computer control(PLC+LCD+mouse |
Q:How many workers are needed to operate one set of asphalt plant?
A:1 loader operator, 1 mechanical, 1 electrician, 1 supervisor ,1 the operator of the whole plant.
Q:How many days are used for installation of one set asphalt plant?
A:Around 20-30 days, according to local situation.
Q:Do you provide overseas erection and training service?
Q:How long is the delivery time?
A:30-40 days, according to different configuration. We promise to delivery on time.
Q:Can you sent me some spare parts freely?
A:Some spare parts will be sent to you together with asphalt plants freely.
Harbin, Heilongjiang, China
Send your inquiry to this supplier