Industrial FRP water tower price/cooling column
Industrial FRP water tower price/cooling column
Industrial FRP water tower price/cooling column

1 / 1

Industrial FRP water tower price/cooling column

Get Latest Price
Send Inquiry
Model No. : KN-50T FRP Water tower price
Brand Name : Carno FRP Water tower price

Product description

 Industrial FRP  water tower price/cooling column   1. FRP Water tower price adopts the high quality PVC fill, its peak nested fan lines to enhance cold heat exchange ability, and is worth by high temperature of 60 °C, water cooling effectiveness guarantee as to the best level. At the same time with high temperature resistant type water tower supply, is worth by 60-95 °C high temperature water, especially suitable for electric power industries
  2. Fan of   FRP Water tower price :axial flow fan, uses the advanced plastic, or aluminum alloy manufacture, every fan before they leave the factory will have been strictly set from small and balance test.   3. All metal main parts of Industrial cooling tower system  : the thick body steel manufacturing, the international standard hot galvanized antirust processing, but also provides full stainless steel fittings   4.   FRP Water tower price shell and chassis, are all acid alkali corrosion resistance of glass fiber reinforced plastic senior (FRP), all pipes and water spray equipment adopts advanced plastic, need not add the lubricating oil, ensure durability  

1. Reference the operation quality of Industrial cooling tower system  and checking the safety coefficient of foundation bearing capacity.

2. Industrial cooling tower system  should not be installed on the smoke, heat, open flame.

3.   Industrial cooling tower system should not be installed on the presence of corrosive gas.

4. Industrial cooling tower system of the vent and the distance between the obstacles should be more than 3 m.

5. Circulating water pump suction part should be set below the position of the cooling tower pond water.

6. Industrial cooling tower system should be set pipeline stages, the cooling tower don't directly pipeline under weight.

7.The function of  large refrigeration towers circulating water related, should check whether the reach regulation

8. Regularly check  large refrigeration towers  water level, water temperature, the motor power, voltage, and cooling tower 

vibration and noise, etc.

9.Winter operation of   FRP Material cooling tower  should pay attention to not use ventilation window, 

easy is covered with ice and snow, cold water circulation,may cause the water system and packing frozen.

  Technical parameters of  FRP Water tower price 
  Detailed of  FRP Water tower price 
    Project case of  FRP Water tower price 
      Note: 1.T/T ,50% as deposite and the balance to be paid before shipment 2.With one year warranty 3.The machinery will be packed with standard wooden case  4.One unit in one international wooden case 5.Delivery time :About 20 days upon receipt of deposit   Thanks for your attention of our  FRP Water tower price 
and welcome to visit our website and factory !      
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628