Product description
Primary Framing Elements of Prefabricated Steel Buildings
Columns, beams and all primary members are made by H section steels- hot rolled section steel/ welded section steel, which will be bolted together at site. A factory primer and facing paintings are applied to get better anti-rusting effect of primary framing elements.
Secondary Steel Framing
Purlin, Tie Bar, Roof and Wall Support are formed as secondary framing
Bracing of Steel Buildings
Round steel is supplied with knee bracing and other supporting parts that need portal framing, which will improve the stability and durability of the whole structural building.
Cladding of Steel Structure House
Roof and wall are covering of color-coated corrugated steel sheet or steel sandwich panel, hot dipped with zinc and aluminum compound, that is fixed to the outside of structural building to protect it against bad weather or to make it look more attractive and last for generations.
Windows: Plastic Steel Window/Aluminum-alloy Window
Door: Sliding Door/Rolling Door
Other Options
Gutter, Downpipe, Transparent sheet, Ventilator and Bridge Crane will be fitted according to client's requirements