Product description
Product Details
Full-automatic production lines
2- Daily production can be reached 600,000 pieces
3- Six colors printing machine
4- 99.7% pure aluminum
5- Enclosed workshop
6-Inner coating resins are supplied by PPG Group
7- Aseptic packing
8- Strong quality inspection department, check the quality during sampling making
and production manufacturing
9- Products : Eco-friendly, 100% recyclable,Lightweight, unbreakable,Corrosion resistant,
Longer shelf-life for products
10- Customised logos and designs are available Specification of Aluminium Tubes for Various Purposes |
For Hair Colour |
Name | Specification | Volume |
DIA25 Aluminium Tube | 25m*150/5mm | 50ml |
DIA28 Aluminium Tube | 28*160mm | 60ml |
DIA30 Aluminium Tube | 30*185mm | 90ml |
DIA32 Aluminium Tube | 32*175mm | 100ml |
DIA35 Aluminium Tube | 35*175mm | 120ml |
For Glue/ Oinment/ Paint / Cosmetics / Shoes polisher |
Name | Specification | Volume |
DIA13.5 Aluminium Tube | 13.5*80mm | 8ml |
DIA16 Aluminium Tube | 16*80mm | 15ml |
DIA19 Aluminium Tube | 19*110mm | 25ml |
DIA22 Aluminium Tube | 22*120mm | 37ml |
DIA25 Aluminium Tube | 25*135mm | 50ml |
DIA28 Aluminium Tube | 28*160mm | 60ml |
DIA30 Aluminium Tube | 30*175mm | 85ml |
DIA32 Aluminium Tube | 32*175mm | 100ml |
DIA35 Aluminium Tube | 35*175mm | 125ml |
DIA38 Aluminium Tube | 38*175mm | 150ml |
DIA40 Aluminium Tube | 40*200mm | 200ml |
FAQ:
1. Q: Are you a factory or trading Company?
A: We're manufacturer as well as trader.
2. Q: Where is your factory located?
A: Our factory is situated in Guangzhou.
3. Q: Is there a minimum oder quantity?
A: Yes, the MOQ is 30000 pieces.
4. Q: How long will it take to receive my products?
A: As a general rule for available mold's products, it takes 3 to 5 weeks for production.
5. Q: We would like to have a look at a sample before we continue with the orders. Can we get a sample from you?
A: Yes, but if you require a customized sample, you will be charged sample fee and it takes us in general 7 to 15 days to prepare samples.
6. Q: What is your payment term?
A: 30% deposit before production and 70% balance should be paid by T/T before shipment.