Specifications Yida High Quality Rebar Splicing Coupler
2.100% Bar Break Performance
3.Top Leader of Mechanical Rebar Splice in China
Hebei Yida Coupler
Upset forging straight screw thread coupler rebar coupler
Yida Rebar coupler is applied to reinforced concrete construction in various kinds of
construction projects. It is regarded as an innovated construction material andconnection, with characteristics of 'energy-saving, environment friendly and high
efficiency'. It is a technical product highly pushed by National and DistrictConstruction Department. 1. Product Features
*Designed and manufactured in compliance with ACI318, JGJ107, UBC 1997, BS8110, NF35-20-1, DIN1045, ISO 15835. *Full-Tension splice, bar break under tensile tests. *Easy operation, installation and maintainance. *Full traceability of material origin and production batch. *Manufactured under strict quality assurance plan ISO 9001. 2. Product Type 2.1 SYS A: Parallel Thread Rebar Splicing with Cold Upsetting End (1) Cutting (2) Cold upsetting (3) Threading
2.2 SYS B: Parallel Thread Rebar splicing with Rolled Thread End (1) Cutting (2) Stripping the rib and rolling thread
Its features are: 1.A new way for rebar mechnical connection with high quality and efficiency.
2. Easy Operation, saving time and rebar material. The rebar coupler producing and rebar end threading will not be affected by the weather; It can be processed before processing.
3. With the thickness and length of the rebar coupler, the connecting part has higher tensile strength than the rebar part. Customer special demand is available. 3.Yida Parallel thread rebar couplers for building material,rebar coupler steel couplers Advanced Automatic Steel Bar Coupler production center:
4.Rebar Coupler Strictly Quality control System:
5.Tensile Strength Test : 100%Bar break high tensile strength
6.Test Report by National Center for Quality Supervision And Test Of Building Engineering
7. Project Cases
National Important Cilivl Engineering application with Yida rebar coupler and thread machine:
Project Cases & Cilvil Engineerings List: Hongkong-Zhuhai-Macao Croess Sea Birdge Fujian Fuqing Nuclear Power Plant Hangzhou Bay Oversea Bridge Wuhan 606 Meter High rise Building Hangzhou Bay Oversea Bridge Shenyang Olympic Sports Center Wuhan Yangtze River Bridge Jinping Hydrulic Power Plant Pakistan National Nuclear Power Plant India Tower(No.1 in India)-INDIA Russian Federation Tower-RUSSIA Ba Haj Stadium-ALGERIA Penang Second Bridge-MALAYSIA 8.Certificate and Third Party Tested : Trustwave,D&B,ISO&SGS Certificate
Best quality bottom price 100% bar break 12-40mm Rebar Splicing Coupler Regards Ms.Rainbow My Name card for your convinence