Heavy Duty Commercial Fryer Machine 2 Tanks 2 Baskets Chip Fryer
Heavy Duty Commercial Fryer Machine 2 Tanks 2 Baskets Chip Fryer
Heavy Duty Commercial Fryer Machine 2 Tanks 2 Baskets Chip Fryer

1 / 1

Heavy Duty Commercial Fryer Machine 2 Tanks 2 Baskets Chip Fryer

Get Latest Price
Send Inquiry
Model No. : ET-TSRQZL
Brand Name : ETON

Product description

     Recommend Products     Heavy Duty Commercial Fryer Machine 2 Tanks 2 Baskets Chip Fryer   Product Show    

Basic parameters of products

Name:

Chip Frye

Brands:

ETON

Model:

ET-TSRQZL

Formal Size:

609 x 666 x 412 mm

Gas Type:

LPG

Gas pressure:

2800Pa

Material:

Stainless steel

Net weight:

26kg

Packaging:

Carton 

MOQ:

50

  Product Introduction   Technical Features: High quality stainless steel.
Good adhesion, do not miss the food crumbs.
Adjustable firepower.
Burner is a seamless steel pipe, can play a self flame stabilization purposes.   Installation Requirements and Considerations: 1. Installation Requirements Installation: the machine away from the wall must be at least 10cm, in case the machine need to be installed against a wall, that wall must be fire-resistant to prevent burning.
Installation location should be in a well-ventilated place, and to install an exhaust fan to ensure the work process, the steam and exhaust gas after combustion.
After installation of the machine, be sure to keep a smooth, horizontal not inclined, nor can the use of shaking.
When installing the first application is due to gas suppliers licensed to use this type of gas, to verify the gas supply is consistent with the future use of gas, can be installed.
Do not use this machine does not comply with other gases used as fuel and high pressure regulating valve. (This machine is only suitable for low-pressure control valve)   2. gas connections The machine must be installed before installing a quick disconnect gas supply valve, and must be placed near the machine easily touch the upstream position.
Make sure the machine is turned on with the same type of gas, if not identical, please do not turn on the gas connection pipeline having been painted yellow.
Pipeline connected to the machine must be used for the metal pipe to connect.
The machine should be using liquefied petroleum gas for testing.
If 10% higher than the rated pressure pipeline pressure requirements of the machine, you need to install a regulator to ensure that the rated pressure.
Once connected, use soap and water to test for leaks or pipe connections with a detection test, "Do not test the ignition source of fire!"   3. Precautions Do not place flammable items (such as towels, etc.), placed anywhere on the oven surface, it may cause burning fire accident.
After use, immediately turn off the gas valve.
If found leak, immediately turn off the gas valve, open windows to enhance ventilation, do not switch the power and electrical system to be repaired before use.   4. Maintenance Always clean up dirt and oil grill online basin. (Recommendation: twice daily)
If not used for long, first with painted cloth gasoline, cleaning stainless steel surfaces, well-ventilated place.
When cleaning equipment, do not use cleaners containing wear material, tools such as brushes or scrapers to clean the stainless steel surface, since the residual iron can cause rust. And in accordance with the direction of satin cloth, do not use the product to clean steel surface contains chlorine (bleach, hydrochloric acid, etc.), even though these products have been diluted and do not use.
Preheat the first ten minutes after work.
This product can not be washed with water directly.
Do not use corrosive substances (for example: potassium chloride) under floor cleaning equipment.
To regularly clean the furnace burner dirt. (Recommended once a week)   Company Information   nack ma  
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628