small plastic tool boxes
Product pictures
Mold information
No. | Item | Description |
1 | Product | small plastic tool boxes |
2 | mold base | DME,HASCO,LKM |
3 | No.of Cavities | Single,multiple,family. |
4 | Core &Cavity steel | S136,NAK80,P20,8407,718H,738H,H13,etc |
5 | Certificate | ISO9001:2008,SGS,RoHS |
6 | mold components | DME,HASCO equal |
7 | runner | Cold runner/Hot drop system. |
8 | working Life | 100,000 shots to 1,000,000 shots. Accordingly |
9 | feed gate
| Tunnel,side,point
|
10 | Lead Time | 15 days to 35 days. |
11 | Packaging | PE film and export standard fumigation wooden box. |
12 | cavity finishing | texture,matt,mirror |
13 | loading Port | Zhongshan or Shenzhen Port |
Product procedure
•Receive 3D drawings or samples from clients.
•Discussion on the quality,price,material,delivery time, ect
•According customers requirements to make the mould
•Send samples to customers for approval
•After customer approved the sample, go ahead bulk production
•Delivery goods by sea or by air,according to customers needs.
Mold process small plastic tool boxes
Description small plastic tool boxes
Reliable choice 1: Since 2007 , 8years Experience on mold and plastic parts making industry. 2: 6 mold making team,68 technicians, and 12sets CNC machines 3: 38 Injection Machines with 200 workers (90ton-650ton injection machines) 4: You reach us anytime,no mater working time or vacations. 5: All our molds to be lifetime maintenance.
Product delivery
We have our own QC department to make sure that all our products are in very good quality before ship out to our customers.
Advantages 1. One stop solution,production,assembling 2. Advantage equipment: High Speed CNC, Mirror EDM, Sodick WT machine,CMM, etc. 3. ISO 9001:2008 registered and SGS certificated factory. 4. RoHS Compliant, favourable price with good quality. 5. Lifetime maintenance for all of our molds.
Quality Control:
(1) Before the order to be confirmed, we check the material and color of raw material by sample which should be strictly the same as bulk production.
(2) We will be tracing the different phase of production from the beginning.
(3) Every parts quality checked before packing.
(4) Before delivery to clients, our customer can send QC or appoint a third party to check the quality. We will try our best to help clients when problem occurred.