grooved fittings ductile iron pipe fittings
grooved fittings ductile iron pipe fittings
grooved fittings ductile iron pipe fittings
grooved fittings ductile iron pipe fittings
grooved fittings ductile iron pipe fittings
grooved fittings ductile iron pipe fittings
grooved fittings ductile iron pipe fittings
grooved fittings ductile iron pipe fittings

1 / 6

grooved fittings ductile iron pipe fittings

Get Latest Price
Send Inquiry
Model No. : U-bolt Sprinkler Tee
Brand Name : WPT

Product description

fire fighting pipe fitting Fire Protection Engineering Specifications 1) FM approved Victaulic grooved iron pipe fittings  
2)FM&UL&CE&LPCB&VDS&ISO Victaulic 
3)Material:Ductile Iron  conforming to ASTM A536, Grade 65--45--12  
4)Finish: Paint, Epoxy Powder and Darcrome 
5)Color: Red RAL3000, 6)Gasket:EPDM 7)Bolts and Nuts: ISO 898-1class 8.8     Certificates:   1)FM & UL & CE & LPCB & VDS & ISO 2)ANSI, ASTM,DIN,BS     Application:   1)Automatic sprinkler system for fire protection on commercial ,civil and municipal constructions like water supplying ,gas supplying, heat  supplying,etc 2)Industrial pipeline system on shipping ,mine, oil field,textile,powder plant,etc. 3)Pipeline system on subway station ,railway station ,airport, seaport,bridge,etc   Packaging:   1)Non-wood pallets (1CBM)with plastic film,30boxes per pallet at most.
2)National boxes,non-wood pallets(1CBM)with plastic film ,30boxes per pallet at most.
3)Non-wood cases(1CBM).  

Name

Coupling, elbow, tee, cross, reducer, cap, mechanical tee, mechanical cross, flange adaptor

Standard

ANSI, ASTM, DIN, JIS, GB, BS, etc.

Type

Manufacturer

Size

1/2"-12"

Material

Ductile iron ,carbon steel,stainless steel,pvc,HDPE

Finish

Paint, Epoxy or Galvanization 

Approval

FM/UL/CE

Usage

1)    Automatic sprinkler system for fire protection on commercial, civil and municipal constructions like water supplying, gas supplying, heat supplying, etc.

2)    Industrial pipeline system on shipping, mine, oil field, textile, powder plant, etc.

3)    Pipeline system on subway station, railway station, airport, seaport, bridge, etc.

Payment

L/C or T/T

Delivery Time

within 30 days or as per customers requirement

grooved fittings ductile iron pipe fittings
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628