Good quality aluminum access floor panels
Good quality aluminum access floor panels
Good quality aluminum access floor panels
Good quality aluminum access floor panels
Good quality aluminum access floor panels
Good quality aluminum access floor panels
Good quality aluminum access floor panels
Good quality aluminum access floor panels

1 / 6

Good quality aluminum access floor panels

Get Latest Price
Send Inquiry
Model No. : R7-PRT-AL
Brand Name : Parete

Product description

Good quality aluminum access floor panels Product Description   Aluminum access floor panel is cast from aluminum ingot in high press and vacuum environment. The surface treatment can be epoxy powder coating painting or Nickel and Chrome electroplating to achieve appearance of soft light, anti-corrosion, wear resistance and stable character. PVC or HPL  can be glue on the surface in high pressure. Aluminum access floor panel  is the most high-class in all kinds of access floor. Advantages: 1. Innovated structure design, high dimensional accuracy, difficult to deformation; 2. Light weight and high strength, good loading capacity; 3. Waterproof, fireproof, anti-corrosion, anti-magnetic, non-radiation and environment friendly; 4. Stable structure and never weakening, good conductivity; 5. Economical and recyclable.   Application areas: High standard computer room of bank, military, government or companies, or the area of cleaning room, or some area that have high requirement to loading capacity and material.           Technical features     Technical data of aluminum anti-static access floor  

NO.

Size

Thickness

Concentrated load

(deflection=2mm)

Ultimate

load

Uniform

load

Rolling load

Electrical

resistance

(mm)

(mm)

lb

N

kg

N

N/m2

N

deflection

Permanent deformation

(Ω)

PRT-TF800

600×600 

50

800

3550

363

10650

16500

2950

2mm

0.5mm

106- 1010

PRT-TF1000

600×600

50

1000

4450

454

13350

23000

3560

106- 1010

PRT-TF1250

600×600

55

1250

5560

567

16680

33000

4450

106- 1010

PRT-TF1500

600×600

55

1500

6665

680

26690

43000

5560

106- 1010

CICAS or BS standard size panel

Parete can provide the size  24’’ ×24’’ (610mm×610mm) access floor panel. 

Floor covering

HPL, PVC or Ceramic tile (Page 18-21)

Raised height

Normally from 100mm to 1000mm, above 1000mm, it should be in special solution.

Electrical resistance

It will be 104-106 When use the PVC coverings.

    Floor Covering-PVC Conductive particles forms a special material with a perfect permanent conductivity. The conductivity makes the tile free of dust and easy to clean or maintain. Fire-proof rating FV-0 grade. Durable, waterproof, anti-chemical corrosion. It bears heavy load. Excellent tones and textures. Marbling appearance. Better flexibility. It is comfortable to walk through and hardly damage due to collision. It is often used in the following areas: Electronics workshop/Manufacturing plant, Big computer room/ computer server room, Clean room, Packaging workshop, Telecommunication room, Hospital equipment room.        Floor covering-HPL After using a variety of special paper phenolic, melamine, resin processing, high temperature and pressure made of thermosetting resin decorative laminates. It is not only bright color, bright and smooth, and has a wear-resistant, heat resistance, pollution, washable and permanent decorative features, the standard thickness of 0.8mm, 1.0mm, 1.2mm, 1.5mm, the thickness can development of user requirements.   High pressure melamine laminate is widely used in varies computer rooms and data centers. It is anti-static, anti-wear and free of pollution.  It is anti scratch and wear resistance. It is economical and easy glued on the surface of metal, calcium sulphate panel and wood core surface. So it is the most welcome floor covering.          Certifications   Applicatoin areas

Industry

areas

manufacture

Electronic factory, transformer substation, hydropower, oil tank, cement factory, motor industryetc.

financial

Bank, security, telecom, insurance

Commercial

Hotel, Shopping mall, intelligent office, logistic center

Government

School, tax bureau, police station, frontier inspection station, national defense center,industrial and commercial bureau, custom, national conference centeretc.

Public facility

Hospital, military, highway, airport, TV station, radio and TV center

    Installation 1. Preparation before  installation: 1.1  Installation should be started after finishing the work of civil engineering and interior decoration. 1.2  The base floor should be level, cleaning, dry, without debris and dust. 1.3The cable, electrical appliance, tube, air conditional system should be finished before seal the access floor panel. 1.4  The heavy equipment should be fix on the special substructure. The finish level of substructure should matched the access  floor finishing level. 1.5  The 220V/50HZ power and water supply should be prepared for construction. 2.  The installation tools (1)  Cutting machine (2) Laser level meter  (3) Bubble level meter  (4) measuring tape (5) chalk line(6)Sucker (Picture) (7)nut    wrench  (8) Phillips screwdriver  (9) Dust collector  (10) broom, mop 3.Installation procedures 3.1 First check the flatness of the floor and verticality of the wall. If something is not within the requirements, should inform the owner or contractor to adjust. Cleaning the site for any debris. Keep the site in dry. 3.2 Marking: Mark the finished height of the access floor on the wall to ensure that all the panels  are in the same level. Take a accurate measure of the width and length of the room, and optimize the arrangement of the panels to minimize the cutting work. Snap the grid lines of the pedestals on the ground. 3.3 Adjust the height of the pedestals before installation, and lay the pedestals on the spots of crossing point. 3.4 Fix the stringer on the top of pedestal, and use the level meter to adjust the stringer so that they are vertical to each other. 3.5 Use the sucker to take the panels on the stringers. 3.6 If the space closes to wall is small than the size of panel, the panel should be cut to fit for the space. 3.7 During laying down the panels, use the bubble lever meter to make panels in level. Height of the floor is adjusted by pedestal. 3.8 If the equipment is heavy, extra substructure should be fixed to support the equipment to avoid the deformation of panel. If the  access floor panel should be cut or opened a hole, electrical drill should be used to drill a hole of Φ6mm-Φ8mmin the corner spot to avoid the extended breakage of the floor covering.   4. Checking standard of the access floorinstallation 4.1 The underfloor and surface should be cleaned, without dust and debris.
4.2  The surface has no scratch. There is nothing come off the access floor panel.  The edges are not damage.
4.3  The finished access floor system should be stable.  When walking on the surface, there should be no shaking or noise.
4.4  The joints of the access floor should be kept in a line. The adjacent panels differential should be within 1mm.
4.5  The high difference of the adjacent panels should not more than 1mm.       Company Information Parete is a professional manufacture of raised access floor system products. Parete anti-static access floor and raised floor system have been used in manage landmark projects in China. Parete have accumulated much experience in application in computer room, monitoring room, IT data center, cleaning room, commercial cabling raised floor application. Parete access floor have been exported to 23 countries in the world.  Guangzhou is the export center. Parete will continue to provide the best quality products to the customers from different countries.       
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628