Go Green asphalt cold mix / instantly pothole repair / asphalt driveway repair
Go Green asphalt cold mix / instantly pothole repair / asphalt driveway repair
Go Green asphalt cold mix / instantly pothole repair / asphalt driveway repair
Go Green asphalt cold mix / instantly pothole repair / asphalt driveway repair
Go Green asphalt cold mix / instantly pothole repair / asphalt driveway repair

1 / 3

Go Green asphalt cold mix / instantly pothole repair / asphalt driveway repair

Get Latest Price
Send Inquiry
Model No. : GAP01
Brand Name : Go Green

Product description

Go Green asphalt cold mix / instantly pothole repair / asphalt driveway repair     Go Green Superior Cold Mix Asphalt is a Superior Permanent Road maintenance material, uses a high performance polymer formulated to guarantee its good workability, applicable in all weather conditions and can works in water, repair both asphalt and concrete driveway, no tools needed, accept traffic immediately after installation.   Application Range   Go Green cold mix asphalt is best choice to repair potholes, utility cuts, road edges, water main breaks, also be utilized as permanent asphalt patch, trench reinstatements, man hole adjustments.   Go Green cold mix asphalt can repair both concrete and asphalt road easily.  
Outstanding Features:   1. All weather to use 2. Applicable for rainy and snowy 3. Used in concrete or bituminous pavements 4. No need tar coating material 5. Permanent repair, no need to maintenance at least 10 years  6. Construction is simple, open to traffic soon 7. Working temperature is -25℃ to 50℃ 8. Shelf life unopen 2 years 9. 100% eco-friendly, cold mixing   Packages are available in 20kg bag, 20kg bucket and 1 ton bag           Step 1 Clear   Sweep the base of the pothole of any loose debris by sweeping or raking. Ensure that no large loose rocks are present in the pothole before pothole repair step 2.   Step 2 Pour   Fill the pothole with Go Green cold mix asphalt. Recommended compacted depth is 50mm. If area is deeper than 50mm, compact in layers (no deeper than 50mm per layer).   Step 3 Tamp   When hole is filled, apply a small crown to repair area to allow for additional compaction. Now tamp, or wheel roll for the final time , and you may now open to traffic – immediately!! It’s that simple.     One container can load 1000 pieces of 20kg bags, 48 pieces of 20kg bucket or 20 ton bags.                 Our Service     Welcome to contact us, or call us 021-61053027, we will reply to any of your question at the earliest time.  
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628