whatapp:+8615942392116 Product Description Decription of freeze dryer Vacuum freeze drying technology is the most advanced technology for food dehydration processing at present. Compared with the common drying method, the freeze-dried food produced with this technology features long period of quality assurance, good re-hydration nature, good-looking color, good flavor, taste, shape and high content of nutritious components. The dried food basically remains unchanged in its volume and shape, it looks like sponge and has no shrinking. This kind drying technology can be widely used in process of vegetables, fruits, condiments, aquatic products, biological products, medicine, beverage and etc. 1. At least 1500kg/batch high capacity
2. Continuous running without trouble
3. Low energy consumption
4. Complete automatic.
Xinyang LG30 Specification: |
the steam consumption for the heating | ≥150kg / hour |
Weight (unloaded) | 5000kg (approx.) |
Chamber – Over all dimensions | 4.40m long x 2.50m wide x2.70m high (AISI 304 S/S) |
Vapour Condenser Capacity | 60 kg in a hour |
Number of shelves | 80 trays |
Usable Shelf Area (m2) | 30 m2 |
Ice Capacity (kg) | 60 kg in a hour |
Shelf Dimensions | 560*680*35mm |
Shelf Spacing (mm) | 35mm |
Shelf Temperature | -20oC to +60oC |
the condenser temperature | - 45C |
Low temperature model: shelf freezing to -35oC and vapour condenser temperature -45oC |
Free distance between heating plates | 75mm |
Heating medium | Hot water |
Heating type | Double-sided radiation |
Heating medium, max. temperature | 130 C |
heating flange | ≥5 C / min speed |
the speed of cooling | 7a min (from 20C to – 40C without load) |
Cooling medium | Ammonia, freon |
Material of heating plates | Aluminum |
Sublimation(max) | 2.5kg/m2h |
Sublimation(average) | 1.5kg/m2h |
Power Requirement | 380VAC/50Hz,3phase,100KW(no including refrigerator) |
Vacuum | 133Pa (working 50pa ~ 133Pa) |
Material of vapor trap | Stainless steel |
water for bathing | automatic de-icing , no need water |
Advantages 1. Efficiency of Heating plates The material of heating plates are aviation aluminum with anodized on the surface, over 100% heat release to the product by radiation way, keep good heating uniformity everywhere. 2. Alternate Vapor trap Double vapor trap located under the heating plates inside drying chamber, Just trap 1 condensates water vapor until it can't catch vapor any more, then trap 2 starts condensation function, and trap 1 will begin to be defrost ice for another condensation cycle. 3. Continous De-icing When the trap 2 begins to catch water vapor, the trap 1 begins to be defrost ice on the tube bundle during product drying, after de-icing, the empty and smooth tubes for another condensation cycle. 4. Automatic control system Advanced intelligent control system keeps whole system stable and reliable running for a long term, furthermore, Simple operation method can be much easier to master. Model& Specification
Specification Model | LG30 | LG50 | LG75 | LG100 | LG125 | LG200 |
Heating Areas(m2) | 30 | 50 | 75 | 100 | 125 | 200 |
Numbers of Vapor trap | Single | Double | Double | Double | Double | Double | Double |
Trapping Capacity | >400kg/batch | >66kg/hr | >110kg/hr | >165kg/hr | >220kg/hr | >275kg/hr | >440kg/hr |
Heating Medium | Water&electric | Water&Steam | Water&Steam | Water&Steam | Water&Steam | Water&Steam | Water&Steam |
Heating Mode | Double side radiation |
Temperature range of Heating plates | <95℃ | +20~+130℃ |
Vacuum Pressure (Pa) | 20~133 |
Need Refrigeration Capacity (t0=-40℃,tk=-35℃) (Kw) | 55 | 80 | 120 | 160 | 200 | 320 |
Consumption of Steam (kg/h) | None | 150 | 200 | 280 | 340 | 400 | 690 |
Electric Power Supply (Kw) | 75 | 40 | 43 | 63 | 69 | 85 | 115 |
Tray Numbers | 78 | 80 | 120 | 180 | 240 | 300 | 480 |
Loading Raw Material | >390 | >400 | >600 | >900 | >1200 | >1500 | >2400 |
Product Pictures
Warranty 1.We guarantee that the commodity hereof is made of the best materials and new brand with top workmanship, and in accordance with quality specification stipulated in product Contract and
Appendix. 2. Guarantee period shall be within 12 months from the date of acceptance. During this period, if
there are quality problems, we will provide solution by verbal or written communication. If the
problem is unsolved, our engineers will repair for you on site as soon as possible. The
maintenance is free when there are non-operation errors; otherwise it is for the buyer’s account. Our Services Training plan: We will provide training for those who operate and maintain the freeze-drying
machines. Trained by supplier of the equipment in the process of installation and debugging,
people can operate and solve the basic mechnical problems independently. In addition, the persons
who work in general engineering such as refrigeration, boiler, and transformer substation shall be
undertaken by skilled workers. Company Information