Fired heater for delayed coking unit
Fired heater for delayed coking unit
Fired heater for delayed coking unit
Fired heater for delayed coking unit
Fired heater for delayed coking unit

Video

1 / 3

Fired heater for delayed coking unit

Get Latest Price
Send Inquiry
Model No. : TOPICN13019
Brand Name :
standard : Aisi,Astm,Din,Gb,Jis
Whether alloy : Is Alloy
tolerance : ±1%
More
3yrs

Taizhou, Jiangsu, China

Visit The Store
  • Gold Supplier
  • Platform Certification

Product description

Fired Heater

Hydrogen generation reformer 8000m3/h for SINOPEC Taizhou Company  TOPICN13012

Steam reformer contains banks of catalyst filled tubes operating at temperatures around 850 to 1000oC to produce hydrogen or mixtures of hydrogen and carbon monoxide for use in further processes.Reformer Furnace

The tubes are designed to operate at high temperature and pressure for a minimum life at design of 100,000 hours (11.4 years) and so must have high strength and exceptional quality. In order to reduce wall thicknesses and improve heat transfer, alloys of very high creep strength have been developed to give optimum life under severe operating conditions. Generally these materials are operated continuously for long periods but they must also have sufficient ductility after ageing to be shut down when required.Waste Heat Boiler


Fired heater for four-in-one reformerHydrogen generation reformer tube

Video

Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628