Earth Excavator/pile driver,Earth Drill/Deep drill/pile driver
Earth Excavator/pile driver,Earth Drill/Deep drill/pile driver
Earth Excavator/pile driver,Earth Drill/Deep drill/pile driver

1 / 1

Earth Excavator/pile driver,Earth Drill/Deep drill/pile driver

Get Latest Price
Send Inquiry
Model No. :
Brand Name : DELI
10yrs

Langfang, Hebei, China

Visit The Store

Product description

Earth Drilling/Earth Excavator/pile driverPile Driver,Earth Drilling, Pile Driver

We produce pole drilling machine/hole Digger/earth drilling, which is widely used for cement pole and solar panel support in digging hole, drilling hole, driving pile .Our hole Digger/Earth Drilling/drilling machine is the first hydraulic hole Digger/Earth Drilling/drilling machine, its speed is five or six than other hole Digger/Earth Drilling/drilling machine. This hydraulic hole Digger/Earth Drilling/drilling machine is based on independent research , first adopt tractor as power, topping drill pipe design, achieve driving and operation integration.

It has good cross-country performance. Tractor can carry trailer lever to achieve digging integration.

pole drilling machine price /hole Digger/earth drilling manufacturer

Pole drilling feature:

1, use type 50-65 tractor as main power. Its good cross-country performance ,can well adapt digging work in outside. Fully hydraulic form , drilling down at the same time by two large tonnage oil cylinder promote drill bore into the downward, largely improve the work efficiency. pole drilling machine price /hole Digger/earth drilling, Topping drill pipe design, Only one person can finish work.

 

Technical data

Power equipment:50-65 tape four-wheel tractor

Drilling depth : 1-3.8 m

Drilling diameter:150-1000mm

Drill drive form: hydraulic

Ascending form: hydraulic

Time: 47 second(Dia. 500mm * depth 3 m)

Total weight:3.8 T

Geological layers: applied in  Soil lager ,clay layer, earth with gravel , weathered rock layer, intergeliosol ,etc, not in rock, construction rubbish layer, sand layer, life rubbish.

Operation staff: 1 person

Construction: 1, for digging cement pole hole in power construction, 2,for digging solar panel support hole in solar electrical energy construction. 3,for piling in construction.


Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628