Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction
Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction
Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction
Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction
Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction
Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction
Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction
Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction

1 / 6

Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction

Get Latest Price
Send Inquiry
Model No. : Normal
Brand Name : Shuowei

Product description

Product Description Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction 1.Material:steel
2.Size:48.3mm*48.3mm
3.Surface finish:Painted
4.Standard:BS1139,EN74
5.Package:25pcs/bag, in steel pallet
6.Manufactuer as per customer requirements

Double Coupler: Type: British, American, Germany
                                   Size: 48.3 x 48.3
                             Weight: 1.05 – 1.48 KG
Swivel Coupler: Type: British, American, Germany
                                  Size: 48.3 x 48.3
                             Weight: 1.25 – 1.75 KG
Standard: BS1139, EN 74

Besides, we could supply Forging Parallel Coupler, Sleeve Coupler, Putlog Coupler, Girder Coupler based on concerned international standard like BS 1139, EN 74 and AS 1576.

Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction
Product name
Scaffolding couplers
Type
Right-angle coupler, swivel coupler, connecting coupler
Materials
Q235/Q345 grade steel
Standard
EN74/BS1139/SGS/CE/ISO9001:2000
Dimensions
48.3x48.3mm/48.3x60.3mm/48.3x76.3mm
Nut size
17/19/21/22/23mm
Strength of T bolts
Class 4.8/6.8/8.8
Surface Treatment
Cold galvanized, Hot dip galvanized, Painted, Powder coated
Appearance color
red paint, blue paint, yellow paint, green paint, bright galvanized
Standard weight
0.85kg, 0.9kg,1kg,1.1kg,1.2kg
Feature
High Breaking Strength/Durable/Easy to Assemble and Dismantle
Packing
25 pcs/woven bags
Payment term
By T/T or L/C
Delivery time
25 days upon the Confirmed Contract
Detailed Images Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction
Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction
Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction
Packing & Delivery Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction

The packing of Scaffolding Coupler We usally packed the couplers firstly with small bags, say 25pcs each small plastic bag. And then packed by steel pallet. The special demand for packing is also accepted. Related Products Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction
Advantage Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction Our Mission:Quality First, Serivice Foremost, Create Great Value for Customers.

WHY CHOOSE US:
• Perfect Service: We treat clients in great honest and sincere management is our top mission.
• Competitive Price: Factory Direct Price to support buyer, leave large profits to clients.
• One-Stop-Service: We can provide different types of of welding products.
• Excellent Quality: The whole process from material to finished products can be traced
FAQ Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction
1) Q : When can I get the quotation for my inquiry?
A: Usually the quotation will be sent to you within 8hours upon all product details being clear.

2) Q : How long is the mass production lead time?
A : Normally 10-12days. Rush order is available.

3) Q : Can I get a sample before bulk production?
A : Yes. Usually we will make a pre-production sample for your quality evaluation. The mass production will be started after we get your confirmation on this sample.

4) Q: How long can I get the pre-production sample?
A : After all details (material, sepcifications) being confirmed and the sample fees received, the sample lead time will be within 3 days and Express delivery takes around 3-4 days.

5) Q: Is the sample charge refundable?
A : Yes, normally the sample charge is refundable when you have placed you order. Contact Drop forged EN74 scaffolding sleeve coupler clamps casting for scaffolding parts and construction

Welome to send inquiry to us and visit our factory!!

Contact: Chan
Phone: +86 18231955965(whatsapp, wechat,viber)
Email: chan @ hbshuowei.com

Click here to home page!
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628