1 / 5
Model No. : | DN125 |
---|---|
Brand Name : | Putzmeister/Schwing/Sany/Zoomlion/KCP/IHI |
Technics : | Casting |
Product description
Concrete Pump Casted Elbow and Twin Wall Elbow
Hebei Shengdebaolong International Trading Co., Ltd is the professional manufacturer and exporter of concrete pump elbows for more than ten years with hig hquality and very competitive price.
Technology:
Concrete pump elbow,bend pipe is quenched and carried out carburizing
chemical treatment on the inner wall. So it has high wear
resistance.Twin walls elbow the inner layer is made of high hardness
wear resistant alloy stll by hear treatment and the outer tube is high
toughness and low hardness and low carbon steel,which can guarantee the
construction safety.
Material: Mn13-4, high chromium, 20#steel
Degree: 15D,29D, 30D, 45D, 60D, 90D
Hardness: 62-68HRC
Delivery Capacity: for casted elbow, the delivery capacity is about 15000-30000cbm, for twin wall elbow, the delivery capacity can be 80000cbm.
Types:our concrete pump elbows mainly include single wall elbows, double layer(twin walls) elbows,wear-resisting elbows, advanced technology, work life long.
Pump Brand:Schwing, Putzmeister, Kyokuto, CIFA, Sany, Zoomlion
1. Concrete Pump Casted Elbow and Twin Wall Elbow Detail Information
concrete pump elbow Single elbow
|
concrete pump elbow Double wall elbow
|
|||
DN125
|
DN150
|
DN125
|
||
Casting Steel ,ST52,20# steel,45Mn2
|
Inside(40Cr)
|
Outside
|
||
R275*90°
|
R275*90°+110
|
36°
|
R275*90°
|
R275*90°+110
|
R275*45°
|
R275*90°+211
|
R400*30°
|
R275*45°
|
R275*90°+211
|
R275*25°
|
R275*90°+411
|
R400*45°
|
R275*25°
|
R275*90°+411
|
R275*20°
|
R275*90°+424
|
R400*30°
|
R275*20°
|
R275*90°+424
|
R275*15°
|
R275*45°+170
|
R488*90
|
R275*15°
|
R275*45°+170
|
R180*90°
|
R275*45°+310
|
R500*90
|
R180*90°
|
R275*45°+310
|
R232*60°
|
R275*45°+310
|
R280*90°
|
R232*60°
|
R275*45°+310
|
R240*36°
|
20°Lengthen
|
|
R240*36°
|
20°Lengthen
|
R240*30°
|
25°+740
|
|
R240*30°
|
25°+740
|
R240*15°
|
40°Zoomlion
|
|
R240*15°
|
40°Zoomlion
|
R385*29°
|
|
|
R385*29°
|
|
R315*33°
|
|
|
R315*33°
|
|
2. Our factory
3. Our Concrete Elbow Sample Room
4. Our Other Concrete Pump Parts
5. Flap Elbow
6. Container loading
7.FAQ
1) How can I place order?
A: You can contact as the following:
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.
3) What`s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don`t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
Send your inquiry to this supplier