Column Formwork System/ Fast assembled formwork/ Aluminum Formwork
Column Formwork System/ Fast assembled formwork/ Aluminum Formwork
Column Formwork System/ Fast assembled formwork/ Aluminum Formwork

1 / 1

Column Formwork System/ Fast assembled formwork/ Aluminum Formwork

Get Latest Price
Send Inquiry
Model No. : JB-SX-N064- Column Formwork System
Brand Name : JINBIAO

Product description

Specifications Column Formwork System

Material:aluminium 6061-T6,6063-T6

Easy to handle

Environmental Friendly

100% recyclable

  Product Description     Column Formwork System   1. Speed of construction, 3 days per floor construction cycle.   2. JINBIAO Formwork can be re-used over 300 times.   3. No tower cranes required to lift the formwork from floor to floor, as the formwork is light weight.   4. Very high quality of finish, so good that walls only need a 3 to 5mm skim or putty coat plaster to achieve a perfect finish. No heavy backing plaster.   5. Externally, a good quality textured paint applied provides a high quality finish, again no plastering required.   6. Ceramic tiling can be fixed directly unto the formed concrete finish, again no plastering required to straighten the walls.   7. We offer a complete redesign service of your formwork into your next project maximizing the number of re-uses.   Column Formwork System Details  

Raw material

 Aluminum extrusion : aluminum A6061-T6 

Fabrication

 Cutting and welding fabrication for aluminum extrusionand  

 aluminum sheet

Coatings

 Enamel coating

Wall panel

 Width 600mm/450mm/300mm X Height 2,480mm X

 Thickness 66mm

Slab panel

 Width 600mm/450mm/300mm X Length 1,200mm X

 Thickness 66m

  Column Formwork System Features  

Features

 

 Precise surface of concrete

 Stability

 Completely assembled design andmanufacturing

 Total supply of non-typical size and accessories

 Lightness

 No need to use equipment

 Support remain after removal of deck-beam

 Precise location for electronics and equipment

      Column Formwork System Install  

Day

Procedure

Day1

Survey and setting out.

Install the wall and column reinforcement bars.

Finish the E&M concealed cable containment.

Day2

Install the wall, column panels and the beam panels.

Day3

Install the beam side panels and slab panels.

Day4

Install the beam reinforcement bars.

Finish the E&M cable containment. 

Adjust and reinforce the wall panels and pillar panels.

Day5

Install the slab reinforcing bars and suspended formworks.

Pour concrete.

  Column Formwork System Project Cases       Packaging & Shipping    Column Formwork System Packing and Shipping        Company Information   Column Formwork System Workshop     Our Services Our Services   1. Your inquiry related to our product & price will be replied within 24hours. 2. Well-trained & experienced staff are to answer all your inquiries professional in English of course. 3. Working time: 8:30am - 6:00pm, Monday to Saturday. 4. OEM is highly welcomed. We have strong R&D team here to help. 5. Your business relationship with us will be confidential to any third party. 6.Good after-sale service offered, please get back if you got question.       FAQ Plelase do not hesitate to contact us for more details.   Contact Person: Heather Qian Mobile: +86-15176173293 Tel: +86-311-80979540 Skype: heather-touer QQ: 2571022171  
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628