Specifications Column Formwork System
Material:aluminium 6061-T6,6063-T6
Easy to handle
Environmental Friendly
100% recyclable
Product Description Column Formwork System 1. Speed of construction, 3 days per floor construction cycle. 2. JINBIAO Formwork can be re-used over 300 times. 3. No tower cranes required to lift the formwork from floor to floor, as the formwork is light weight. 4. Very high quality of finish, so good that walls only need a 3 to 5mm skim or putty coat plaster to achieve a perfect finish. No heavy backing plaster. 5. Externally, a good quality textured paint applied provides a high quality finish, again no plastering required. 6. Ceramic tiling can be fixed directly unto the formed concrete finish, again no plastering required to straighten the walls. 7. We offer a complete redesign service of your formwork into your next project maximizing the number of re-uses. Column Formwork System Details
Raw material | Aluminum extrusion : aluminum A6061-T6 |
Fabrication | Cutting and welding fabrication for aluminum extrusionand aluminum sheet |
Coatings | Enamel coating |
Wall panel | Width 600mm/450mm/300mm X Height 2,480mm X Thickness 66mm |
Slab panel | Width 600mm/450mm/300mm X Length 1,200mm X Thickness 66m |
Column Formwork System Features
Features | Precise surface of concrete |
Stability |
Completely assembled design andmanufacturing |
Total supply of non-typical size and accessories |
Lightness |
No need to use equipment |
Support remain after removal of deck-beam |
Precise location for electronics and equipment |
Column Formwork System Install
Day | Procedure |
Day1 | Survey and setting out. Install the wall and column reinforcement bars. Finish the E&M concealed cable containment. |
Day2 | Install the wall, column panels and the beam panels. |
Day3 | Install the beam side panels and slab panels. |
Day4 | Install the beam reinforcement bars. Finish the E&M cable containment. Adjust and reinforce the wall panels and pillar panels. |
Day5 | Install the slab reinforcing bars and suspended formworks. Pour concrete. |
Column Formwork System Project Cases
Packaging & Shipping Column Formwork System Packing and Shipping
Company Information Column Formwork System Workshop
Our Services Our Services 1. Your inquiry related to our product & price will be replied within 24hours. 2. Well-trained & experienced staff are to answer all your inquiries professional in English of course. 3. Working time: 8:30am - 6:00pm, Monday to Saturday. 4. OEM is highly welcomed. We have strong R&D team here to help. 5. Your business relationship with us will be confidential to any third party. 6.Good after-sale service offered, please get back if you got question. FAQ Plelase do not hesitate to contact us for more details. Contact Person: Heather Qian Mobile: +86-15176173293 Tel: +86-311-80979540 Skype: heather-touer QQ: 2571022171