Video
1 / 4
Model No. : | TG-Y-glazed |
---|---|
Brand Name : | Taigong |
Port : | Tianjin |
Cangzhou, Hebei, China
Product description
Glazed panel Forming Machine is a hot selling product of our company. The steel glazed is mainly used for roofting, . Widly used in America, Canada, all the world around ect. Glazed Panel Forming Machine production line contains decoiler, Leveling, forming part, hydraulic cutting, output table, Glazed Panel Machine fully automatic and whole line only needs 2-3 people. We also supply corrugated Roof Machine, and roof Stiffener Machine together. Please check out if any interest.
Equipment Description
1. Profile Drawing and Products for Reference :
2. The Chart of Process flow:
De-coiler---Leveling--Punching--Roll forming---Hydraulic Cutter-Output Table
3. The equipment including :
No |
Name |
Set |
1 |
De-coiler |
1 |
2 |
Leveling |
1 |
3 |
Roll forming machine |
1 |
4 |
Hydraulic cutting |
1 |
5 |
PLC control system |
1 |
6 |
Pump station |
1 |
7 |
Output table |
1 |
4. Technical specification and details of c channel machine :
production mode: automatic roll forming
The width of the feeding material: 1000-1250mm
The thickness of the plate: 0.4mm-1.2mm
Rollers:17
Shaft diameter after processing:¢80mm
The power of the main motor:5.5kw
Scissor material: Cr12Mov, herd steel HRC 58-62°C
Gr12
The material of the back cutting machine: Gr12
The material of the roller: 45#steel
The material of the forming shaft: 45# steel
Length tolerance:±1.5mm
Voltage:380V,50HZ,3 phase(adjustable by customer needs)
Production capability:8m-10m/min
The material of the big shelf: 350H steel
The size of the whole machine: 7500*1500mm*1200mm
The weight of the whole machine: about 5.5Tons
5. Machine Overview:
6. Package:
7. Customers visiting:
8. Payment terms and after-sale service:
1) FOB Tianjin
2) Payment: 30% T/T deposit, and balance the 70% remained before shipping.
3) Delivery time: 50 working days.
4) Guarantee period: 12 months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
5) Spare parts: bearings, buttons, chains, magnetic valve, protective tube etc.
6) Installation and training:
1. If buyers visit our factory and check the machine, we will teach you how to install and us the machine, and also train your workers/technician face to face.
2. Without visiting, we will send you user manual to teach you to install and operate.
3. COST OF INSTALLATION:
The buyer should pay the installation charges (USD 80 one man one day). To the seller`s appointed account by T/T before the seller`s technicians go to the buyer`s factory. The buyer pays the seller`s technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.
We also supply other production for example : Vineyard Post Making Machine, Cable Tray Machine, Shelf Baseplate Machine, Door Frame Machine, ect.
Please check out if interest.
Video
Cangzhou, Hebei, China
Send your inquiry to this supplier