1 / 4
Model No. : | ZQT8-20 |
---|
Product description
Cover | Transparent PC Cover |
---|---|
Power Factor | ≥0.9 |
Light Source Chip | Aqua Lite |
Internal Driver | Isolating Source |
Plug | G13 |
Life | 35000 |
Light Source Chip | Others |
Package | Yes |
Tube Diameter | T8 |
Length | 120cm |
Lamp Base | G13, G5 |
Color Tones | Cool Color |
Power | 20 |
Voltage | 90-260V |
Illuminant | SMD |
Name | 2013 led tube light t8 20w cool white 1200mm smd2835 |
Part No. | ZQT8-20 |
Led Type | High brightness SMD2835 |
Led Qty | 120PCS |
Watt | 20W |
Power Factor | >0.95 |
Voltage | AC85-265V |
Color Temperature |
Pure White:6000-6500K Nature White:4000-4500K Warm White:3000-3500K |
LM | Frosted Cover 1800LM Transparent PC Cover:2100LM |
Tube Cover | Transparent Cover & Milky/Frosted Cover |
Head | Rotating End Caps / G13 Common Plug |
Material | PC cover and Aluminum housing |
View Angle | 120° |
Size | 1200*26mm |
Fetures
1.Special circuit design, each LED selective. |
2. Energy saving up to more than 70% energy than normal fluorescent lamp |
3.Long lifespan: more than 35,000 hours |
4. Built-in constant current driver, high efficiency, stability |
5. No lead, mercury, no RF interference |
1) Production line lighting in factory |
2) Subway, bus, station |
3) Office building, shops, shopping mall |
4) School, hospital, exhibition hall |
5) advertisement lighting and decoration |
Installation Instructions
1. First install the tube on the supplied hanging board.
2. Insert the power cord supplied by our company into the holder at the either end (regardless of the positive and negative),and then connect the AC220V power to light the tube up.
3. This product integrated product with T8 tube and bracket together, you shouldn’t not remove and assemble it.
4. You can use the special wire supplied by our company to connect the multiple lamps in series.
Name | Tracy Zhao | |
zhongqian009@zhongqianled.com | ||
Skype | sang.zhao | |
15900015062 | ||
Viber | 15900015062 | |
Tango | 15900015062 | |
Sang | ||
Linkin | sang |
Payment Terms | L/C, T/T, Western Union |
---|---|
Minimum Order | 10 |
Lead Time / Delivery Time | 15 Day(s) |
Sample Available | YES |
Delivery Details | 3-5 days for the sample,4-10 days under 500-2000 sets. |
FOB Port | Zhongshan |
Loading Info | By sea or air |
Packing Info | 1. Single packing with the corrugated paper tube,25pcs/CTN 2. Size/unit: L1225*35*31mm, Size/carton 1235*200*200mm |
Target Market(s) | North America, Oceania, Eastern Europe, Hong Kong/ Macao/ Taiwan, Japan & Korea, Mainland China, Western & Southern Europe, Northern Europe, Central & Southern Asia |
Send your inquiry to this supplier