Video
1 / 4
Options:
Model No. : | ASTM A192 Seamless Steel Tube |
---|---|
Brand Name : | CHANGYI |
standard : | Bs,Gb,Astm,Jis,Din,Api |
Liaocheng, Shandong, China
Product description
ASTM A192 Carbon Steel Tube specification covers Seamless Carbon Steel Boiler Tubes for High-Pressure Service.ASTM A192 Seamless Steel Tube is applied as minimum-wall-thickness, seamless carbon steel boiler and superheater tubes for high-pressure service, CHANGYI supplies ASTM A192 steel tube in hot rolled and cold drawn delivery state, It is generally used for high-pressure boiler (working pressure does not exceed 9.8Mpa and the working temperature between 450 ℃ -650 ℃) heating surface tubes, header, economizer, superheater, reheater.
Description
Product Name |
ASTM A192 Seamless Steel Tube |
Standard |
ASTM A192 |
Material |
GB / T-10 JIS - Stb33/G3461 Din - St35.8/17175 |
Technology |
Hot Rolled ,Cold Rolled,Cold Drawn,Hot Expended |
Tolerance |
Control with in the standard, OD:+/-1%, WT:+/-5% |
Chemical Composition |
C:0.06-0.18% Si:≤:0.25% Mn:0.27~0.63% S≤:0.035% P≤:0.035% |
Mechanical Property |
Yield Strength/MPa≥:180 Tensile Strength/MPa≥:325 Elongation(%)≥:35 |
Application |
Widely used in automobiles, motorcycles, gas springs, hydraulic machinery, construction machinery and refrigeration industry |
Payment Terms |
1.FOB 30%T/T,70% Before shipment 2.CIF 30% Pre-payment , Balance must be paid before shipment 3.Irrevocable 100% L/C at sight |
Third Party Inspection |
SGS ,BV, MTC |
Advantages |
1.Short delivery time 2.Quality assurance 3.Competitive price, 4.Free Sample |
Delivery Time |
Within 25 days after receipt of advance payment |
Product Show
Application
Our products aye widely used in water engineering,petrochemical industry,chemical industry,electric power industry,agricultural irrigation,urban construction.
Used for liquid conveying:water supply and drainage.For gas transport:gas,steam,liquefier petroleum gas.
For structural use:as pile pipe,as a bridge;Pipes for wharves,roads and building structures.
Packing and Shipping
FAQ
Q: Are you a manufacturer?
A: Yes , we are a seamless steel pipe manufacturer, We have own factory, which is located in Shandong,China. We have a leading power in producing and exporting hot rolled seamless steel pipe,cold rolled seamless steel pipe,cold drawn seamless steel pipe and alloy seamless steel pipe etc. We promise that we are what you are looking for.
Q:Can we visit your factory ?
A:Warmly welcome once we have your schedule we will pick you up .
Q: Do you have quality control?
A: Yes, we can accept BV, SGS third inspection .
Q: Can you arrange the shipment?
A: Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 25-35 days if the goods are not in stock, it is according to quantity.
Q:How can we get the offer?
A:Please offer the specification of the product,such as material,size,shape,etc.So we can give the best offer.
Q:Can we get the some samples?Any charges?
A:Yes,you can get available samples in our stock.Free for real samples,but customers need to pay the freight cost.
Q: How do you make our business long-term and good relationship ?
A: 1.We keep good quality and competitive price to ensure our customers' benefit.
2.We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Video
Liaocheng, Shandong, China
Send your inquiry to this supplier