ASTM 1040 Boiler Steel Pipe
ASTM 1040 Boiler Steel Pipe
ASTM 1040 Boiler Steel Pipe
ASTM 1040 Boiler Steel Pipe
ASTM 1040 Boiler Steel Pipe
ASTM 1040 Boiler Steel Pipe
ASTM 1040 Boiler Steel Pipe

Video

1 / 5

ASTM 1040 Boiler Steel Pipe

Get Latest Price

Options:

  • 42*3
  • 89*8
  • 28*3
  • 57*5.5
  • 133*6
  • 28*2.5
Send Inquiry
Model No. : 840219
Brand Name : H-TONG
standard : Bs,Gb,Astm,Jis,Din,Api
Material : Stba20-Stba26,St35-St52,A53-A369,Stpg42,Q195-Q345,10#-45#,16mn,Stb35-Stb42
Section shape : Round
place of origin : China
application : Boiler Pipe
Production Process : Cold Drawn
Certification : Bsi,Ce,Api
Special tube : Api Pipe,Emt Pipe,Thick Wall Pipe
Whether alloy : Non-Alloy
tolerance : ±1%
Category : Seamless Steel Pipe
Processing Service : Bending,Welding,Decoiling,Punching,Cutting
Section Shape : Round
Technique : Cold Drawn
Origin : China
Wall Thickness : 0.5-45mm,According to Customer requirements,1mm-15mm or According to Customer requirements
Surface Treatment : Black painting or According to Customer Requirement
Length : Max Length 12M or According to Customer Requirements
Material : 20G、20MnG、25MnG
WT Tolerance : ±10%
Application : Used in pipes for Hydraulic Props, High-pressure gas Cylinders, High-pressure Boilers, Fertilizer Equipment, Petroleum Cracking, Automobile axle Sleeves, Diesel Engines, Hydraulic Pipe Fittings, etc.
More
3yrs

Liaocheng, Shandong, China

Visit The Store
  • Gold Supplier
  • Platform Certification

Product description



 ASTM 1040 boiler tube is based on high-quality seamless carbon structural steel, and one or several alloying elements are appropriately added to improve the mechanical properties, toughness and hardenability of the steel. Products made from ASTM 1040 steel typically require heat treatment prior to use (normalized parts made from it typically require tempering or surface chemical treatment (carburizing, nitriding, etc.). Hardening or induction hardening. Therefore, depending on Chemical composition (mainly carbon content), heat treatment process and application, this type of steel can be roughly divided into three types: carburized steel, quenched and tempered steel and nitrided steel. - High-quality carbon structural steel with one or more alloys added appropriately Elements improve the mechanical properties, toughness and hardenability of steel. Products made of carbon steel pipes usually require heat treatment (normalizing or tempering); parts made of 1040 usually require tempering or chemical treatment (carburizing, nitriding) etc.). The seamless pipe is cold drawn or induction quenched before use. Therefore, depending on the chemical composition of c (mainly carbon content), heat treatment process and application, this type of steel can be roughly divided into nitride steel, carbon steel And three kinds of seamless steel.General boiler tubes are mainly used to manufacture water-cooled wall tubes, boiling water tubes, superheated steam tubes, superheated steam tubes for locomotive boilers, large and small smoke tubes and arch brick tubes, etc. ②High-pressure boiler tubes are mainly used for To manufacture superheater tubes, reheater tubes, gas ducts, main steam tubes, etc. of high pressure and ultra-high pressure boilers


Product Name  ASTM  1040 Boiler Steel Pipe
Standard
 ASTM  1040 
Material
ASTM A-106 (Equivalent to 20G、20MnG、25MnG)
Production Process
Cold Drawn
Tolerance
OD :+/-1% ,WT:+/-10% ,Length:+/-5cm
Length
3-12m or as per customers' requirements
Surface
Black Painting or According to customer Requirement
Payment Terms
EXW, FOB, CIF, CFR etc.
Delivery Time
Within 14 days after Receiving 30% TT Advanced or LC at Sight Original
Application

Generally, boiler tubes are mainly used to make water wall tubes, boiling water tubes, superheated steam tubes, superheated steam tubes for locomotive boilers, large and small smoke tubes and arched brick tubes.

High-pressure boiler tubes are mainly used to manufacture superheater tubes, reheater tubes, air ducts, main steam tubes, etc. of high-pressure and ultra-high-pressure boilers.



Boiler Steel Pipe9Boiler Steel Pipe3


Shipping


gongchang1

zs






 1. How can I get a quotation from you ?
    You can leave us message, and we will reply every message in time . Or we may talk on line by Trademanager . And you can also find our contact information on contact page .
2. Can I get samples before order ?
    Yes, of course. Usually our samples are free . we can produce by your samples or technical drawings . We can build the molds and fixtures .
 3. What is your delivery time ?
    A. The time of delivery is usually around 1 month(1*40FT as usual) ;
     B. We can send out in 2 days , if it has stock .
4. What is your payment terms ?
    Our usual payment term is 30% deposite, and rest against B/L. L/C is also acceptatble . 
5. How can you garantee what I got will be good ?
     We are factory with 100% pre-delivery inspection which garantee the quality .
      And as golden supplier on Alibaba , Alibaba assurance will make garanteewhich means alibaba will pay your money back in advance , if there is any problem with the products .
6. How do you make our business long-term and good relationship ?
    A. We keep good quality and competitive price to ensure our customers benefit ;
     B. We respect every customer as our friend and we sincerely do business and make friends with them no matter where they come from


Video

Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628