Specifications compact mobile shelving
1.knocked-down structure
2.Equipped with the pause of moving.
3.ISO 9001; ISO 14001
We are one of the student compact shelving manufacturer factory offer Compact Mobile Shelving
Product Description description
detailed drawing
Product detail structure
Shelf body | Stand Column | Cold-roll steel | 1.5mm | GB708 |
Partition Whole body partition partition flange 25mm (reinforcing rib under the partition) | Cold-roll steel | 1.0mm | GB708 |
Side plate | Cold-roll steel | 1.0mm | GB708 |
Upper cover plate (whole body side plate dimension 300X100mm) | Cold-roll steel | 1.0mm | GB708 |
Panel | Cold-roll steel | 1.0mm | GB708 |
chassis | Main beam and whole frame board (every wheelo frame board have six : 55mm beam bush hole. every hole have sealing | Hot rolled steel plate | 3.0mm | GB710 |
pathway | Rail | High quality steel plate | Solid square tube | GB710 |
Rail box | High quality steel plate | 26X95mm Thickness 3.0 | GB710 |
Pathway | High quality steel plate | 50X185 Thickness 3.0 | GB710 |
Transmission part | Handle crank | ZG45 | Bothway overload clutch double axis transmission | GB1285 |
Transmission shaft | Solid core 45 steel | Φ20 | GB699 |
Linkage rail | Seamless steel tube | Φ20X2.5 | GB699 |
Bearing | Precision bearing | HR6204 | GB/T 307.3-2005 |
Chain wheel | ZG45 | | GB1135 |
Chain | FR420 | Φ8.5, pitch12.7 breaking force 1800kg | GB1244 |
Idler wheel | HT20-40 | Cast iron | Gb11351 |
| Sealing rubber strip | Magnetic fluid sealant | | |
Dust shield | Cold-roll steel | 1.0 | Gb710 |
Barb | Hot rolled steel plate | 3.0mm | Gb711 |
Journal paper shelf specification and material 1.900X650X1950, double side journal paper shelf 2.double column single face steel shelf body, install side board in both side, decorate with wooden sliver in upper and bottom. 3.adopt whole big clapboard 4.upper cover plate adopt 1.0mm whole high quanlity cold-roll steel plate, seamless install Available Colors
Cooperated Partener
Related Product Click to get your favorite
Our main bunk bed products including 1.Steel bunk bed 2.Steel tripled bed 3.Storage rack 4.Bookshelf 5.Lockers 6.School furniture (desk, chair)
Production Process Compact shelving production process 1-Material Cutting →2-Punching1 → 3- Punching 2 → 4-Bending → 5-Spot Welding → 6-Welding → 7- Shot Blasting Machine → 8- Pickling Phosphating → 9- Powder Coating → 10- Assembling → 11-Packing → 12 Warehouse
Certificate Our Certificate
FAQ Our FAQ1) What is your MOQ(minimum order quantity)? A: 50 sets compact mobile shelving 2) If I only buy 20 sets dormitory beds, how will your factory send to me? A: In this case, we will offer you shelf price on LCL basis. Once the goods are finished, we can send the shelf to you by a Chinese agent. If you have any containers loaded in Dalian, we will offer you formitory bed's factory price. When your container is loading, we will send the goods to you directely and help loading the goods into your container. 3) What is the payment terms of your factory? 1)If you are only buy 50 sets and not in China, of course we can also make a good cooperation, accepting T/T 100% for the first order. 2)If you place a large order to us, in order to give you a best situation for business with us, we accept 30% by T/T in advance. The balance,there are 3 ways: we accept pay for 70% of balance in advance loading the container, you can pay for 70% of balance by T/T upon receipt of B/L copy or pay for 70% of balance by irrevocable L/C at sight. 4) What is the delivery date? A: It usually takes about 25 days to finish one full container,but sometimes it may be faster.
Welcome sent inquiry to us, choose us, choose professional. My Name: Leo Tian Trademanager: cn1511570654 Tel: 86 24 62809790 Fax: 86 24 62570622 Wechat: Brilliant_strive Skype: leo-tian