1 / 2
Model No. : | concrete block plant, AAC |
---|---|
Brand Name : | Qunfeng, Qunfeng |
Product description
Technological process: 1. First, dose and match measured raw materials; 2. After distributing, feed raw material into pouring mixer to make slurry. 3. Through thoroughly mixing, the slurry is poured to mould;, 4. After pre-curing under a certain temperature and time, the block would reach a certain hardness and prepare for cutting; 5.Tilting hoister would turn over 90 degrees of mould; 6.Then open the mould and separate it from block. And take the block with side plate to the cutting cart; 8.Secondly the horizontal cutting; 11.Organizing the cut blocks and put them into autoclaves; 12.Hardening the blocks under certain temperature and pressure; 13.Carry the finished product out of autoclave; 14. The finished product hoister take the finished product to stock shield; 15.Packed for loading; 16.The side plate return back through side plate roller; 17. Side plate would be organized with open mould;. 18.Clean the mould and prepare for next pouring; 19.Steel bars processing line for slab production.
|
Send your inquiry to this supplier