500ml  Bottle Rinsing Filling Capping Machine
500ml  Bottle Rinsing Filling Capping Machine
500ml  Bottle Rinsing Filling Capping Machine
500ml  Bottle Rinsing Filling Capping Machine
500ml  Bottle Rinsing Filling Capping Machine
500ml  Bottle Rinsing Filling Capping Machine
500ml  Bottle Rinsing Filling Capping Machine

1 / 5

500ml Bottle Rinsing Filling Capping Machine

Get Latest Price
Send Inquiry
Model No. :
Brand Name : EBA
Type : Weighing-type Filling Machine
Automatic Grade : Fully Automatic
Material Type : Liquid
Filling Valve Head : Multi-Head
Feed Cylinder Structure : Dual-Chamber Feeding
Dosing Device : Capacity Cup
Filling Principle : Atmospheric Pressure
Packaging Container Lifting Structure : Pneumatic Lifting
Structure : Rotary
Packaging Type : Bottle
Packaging Material : Plastic
More
6yrs

Suzhou, Jiangsu, China

Visit The Store
  • Platform Certification

Product description

500ml  Bottle Rinsing Filling Capping Machine


Product description

500ml  Bottle Rinsing Filling Capping Machine(3-in-1)CGF24-24-8 is mainly applied for the filling of beverage. Intergrating with washing,filling and sealing, it realizes full automation in the whole process, suitable for polyester bottle and plastic bottle filling of mineral water and purified water. The bottle types applicable for various parts are easily,conveniently and rapidly adjustable. It adopts new micro-negative pressure filling, stable and reliable.Compared with the machines of the same specification, the benefit of this machine is larger.

The aseptic small mineral water bottle filling machine adopts advanced OMRON PLC to conttrol the automatic running of the machine. The input bottle adopts air conveying device, the output bottle adopts adjustable speed way, which combines with the transducer of the host machine making the output bottle running more stable and reliable. The photoelectrical inspection of the running condition of various parts makes a higher automation and convenient operation. It is the ideal first-choice equipment of beverage manufacturer.

Advantage

1. Air conveyor connecting with bottle-instar wheels. Bottle neck holding transferred.

2. Easy to operate and maintain.

3. With little abrasion, stable transferring, easy to change bottles.

4. With ring type pressure bearing hydraulic cylinder.

5. With high filling speed and exact liquid level.

6. Excellent stainless steel. Electric components are from world famous brands. All achieves national sanitary standard.

7. The bottle-out star wheel is of screw down shape. No need to adjust transferring chain's height to different bottles.

8. Clamp transferring technology varied bottle types.

9. PLC and transducers and other main electric parts are from world famous brands, such as SIEMENS, OMRON, MITSUBISHI etc.


Technical Parameter

Dimension                           3100*2100*2500mm

Weight                                4500KG

Capping machine               1270*810*3220mm

Into the bottle of the fan     2.2KW/4 meter

Washing pump                    0.37kw

Feed liquid pump               0.55kw

Capping motor                   0.37kw

Convey belt                        0.75kw/10 meter

Main motor                         8kw


Flow Chart:

A. PET Preforms →Heat preform → Stretch → Blowing → Bottles

B. Stainless steel multistage centrifugal Pump→ Multiple medium filter→ Active carbon filter→Sodium exchange→ Micro filter→ Reverse osmosis→ Ozone generator→ Water tank→ Water Pump

C. Air conveyor→ 3-in-1 Bottle water filling machine→Lamp checker→ Conveyor→ Dryer→Labeling machine→ Ink jet code printer→ Shrink packing machine→ Stock

filling sealing machineWater filling capping machine

water filling machinebottle filling machine


Packing and Shipping

water filling


Certificate

AaBbCc


FAQ

Q: How about the spare parts?

A: We will send one year enough easy broken spare parts together with the machines, shipping together. During the warranty time, we will supply the spare parts with our cost including the delivery fees.

Q: How long time for installation?

A: According your machines order, we will send one or two engineers to your plant, it will take about 10 days to 25 days.

Q: How to install my machines when it arrives? How much the cost?

A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay air tickets go and back accommodation and USD80/day/person.

Q: When can I get my machine after I paid?

A: Normally production time is around 30-60days, the exactly depend on what kind of machine you order. The shipping time is based on your destination port.

Q: What`s your guarantee or warranty of the quality if buy your machines?

A: We offer you high quality machines with 1 year guarantee and supply life-long technical support.

Q: Are you a trading company or a manufacturer?

A:We are an original equipment manufacturer so that we can provide you high quality machines in reasonable price. Welcome to visit us.



Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628