1 / 5
Model No. : | ZH80GV |
---|---|
Brand Name : | Power Value |
Type : | Concrete Vibrator |
Product description
4 stroke Honda GX160 concrete vibrator is used to consolidate cement and remove all the trapped air bubbles to give you the toughest cement possible, widely used in construction, transportation, water conservancy, port, mine and metallurgy, etc. The concrete vibrator Honda GX160 is transmitted by flexible shaft, speed increased through planet structure, then gain high frequent vibration. It can be adapted to every type of application, vibrator heads and shafts can be easily combined and rapidly exchanged to match the right equipment to the job.
- Product Specification
19
Model
ZH50GV-5.5HP
ZH80GV-6.5HP
Engine type
OHV
OHV
Output
5.5HP
6.5HP
Start system
Recoil
Recoil
Fuel tank
3.6L
3.6L
Displacement
163CC
196CC
Fuelconsumption
295G/HP.HR
280G/HP.HR
Oil alarm
With
With
Shaft model
Cv38
Cv45
Steelhead
38x470MM
45x470MM
Frequency(V.P.M)
9800-12000
9800-12000
Speed(RPM)
3000
3000
Swiny(MM)
1.2
1.3
Standard
lengths(M)
4.5.6
4.5.6
Weight(KG)
18
- Product Details:
Coupling type :
chinese type
Japanese type
Malaysia type
Australian type
Shaft type :
1) China common type
2) Japanese type (with clamp)
3) Japanese type (hexagonal joint)
4) Malaysia type (Dynapac joint)
5) Australian type (3 prong head joint)
- Product photo:
- Company view:
- FAQ:
1.Q:Are you a factory or trading company?
A: We are a factory.
2.Q:Where is your factory located?
A: Our factory is in Duqiao,Taizhou city, Zhejiang Province, China.
It's near Ningbo & Shanghai port.
It's about 1hour from Luqiao air port by car, 45 minutes from Huangyan train station by car.
3.Q:What is the material of your products?
A: Iron,Steel,plastic,etc.
4.Q:How about quality control in your factory?
A:"Quality is first, Customers are friends".
Taizhou PowerValue people are always paying great attentions to quality controlling
from the beginning to the end. Every piece of goods is tested strictly one by one before packing.
We keep goods to meet the standard of CE,CCC, ISO9001:2000.
5.Q:How about guarantee?
A: It's within three months after goods is discharged in the destination.
During that period,if some breakdown easily spare parts need to change,my factory offers free.
For example, fuel cock,spark plug,starting hand,etc.
Send your inquiry to this supplier