2016 China Building Construction Aluminum Formwork System
2016 China Building Construction Aluminum Formwork System
2016 China Building Construction Aluminum Formwork System
2016 China Building Construction Aluminum Formwork System
2016 China Building Construction Aluminum Formwork System
2016 China Building Construction Aluminum Formwork System
2016 China Building Construction Aluminum Formwork System
2016 China Building Construction Aluminum Formwork System

1 / 6

2016 China Building Construction Aluminum Formwork System

Get Latest Price
Send Inquiry
Model No. : DSY
Brand Name : DSY

Product description

Products details: 1. total system forms the complete concrete structure 2. convenient 3. easy operation 4. high quality 5. light and great flexibitity 6. durable, made of special alloy aluminum 7. no need for rehabilitation, no risk of rust and corrosion 8. fast installation owing to its special design 9. speed of construction-4-days each floor construction cycle. 10. Formwork can be re-used over 300 times. 11. No tower cranes required to lift the formwork from floor to floor, as the formwork is lightweight.   Ten Advantages of Aluminum Forming System   1. Light weight, high strength The data has proved that the flexural strength of aluminum is triple higher than ordinary steel.With weight of 20-25KG/M2. Aluminum formwork is the lightest formwork for construction,which makes for easy handling. 2. Various sizes, high accuracy The construction drawing is designed with strict structure, with little measurement error and high accuracy,which is very suitable for high rise buildings. 3. Safe and convenient construction High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training.  4. Long time used With the lowest average lost, aluminum formworks can be used up to 300 times. 5. Wide range used The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies. 6. Excellent quality The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period. 7. High efficiency According to different climatic conditions, the formworks can be removed in 18-36 hours. 8. Recyclable value The used aluminum material is of greater recyclable value,several times higher than steel. 9. Independent support system The gap between the formwork support is totally enough for passing, moving and pulling. 10. Dependable safety, environmental The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth. Comparison of Aluminum Formwork and Wood Formwork
 
NO. Reference Aluminum Formwrk Wood Formwork
1 Material cost (Included Support) 3-216/m2 --16/m2
2 Turnarond times 200times at least 3-5times
3 assembling and dismantling labor cost .6-4.2/m2 .2-4.7/m2
4 recovery value /m2 .8/m2
5 subtotal arifical materials .4-4.9/m2 .5-8/m2
6 leveling the wall plastering labor cost .4/m2 /m2
7 leveling the wall plastering material cost .3/m2 .6/m2
8 ergonomics 20m2/day 15m2/day
9 final ecomic indicators .9-6.4/m2 -13/m2
Picture Presentation   Component for Aluminum Formwork Panel  
Jointing formwork --- wall formwork--- beam forms---- stair formwork ---- concreting --- quality checking---- formwork-stripping

Our Services 1. Any inquiries will be replied within 24 hours. 2. Professional factory for  20 years with advanced facility. 3. Quality guarantee A. All products will have been strictly inspected by our inspector before packing. B. Welcome you to our factory to supervise the production processing and inspect  the goods quality at any time. C. After receipt of the goods within 15 days, have any quality problem,you could raise an objection. 4. Fast delivery A.Sample order in stock, will be delivery within 3 to 7 days. B.The goods will delivery on time according to the contract. 5. Payment T/T,  L/C, Western Union, Escrow. 6. Shipping By sea, we also have strong cooperation with DHL, TNT, UPS, FEDEX, EMS.  7. Best Service after-sales Strong Team!  Best Quality!  High Integrity!  Commitment ! Company Information Hebei Bangda Metal Produts Co.,ltd is responsible for the production and Hebei Dongshengyuan Trading Co.,ltd is in charge of export business.The{tag}two company as a whole, be short of one cannot.      Hebei Dongshengyuan Wire Mesh Factory is a full service manufacturer of wire, woven wire mesh and wire processed products. Started since 1985, Dongshengyuan can supply good quality stainless steel wire mesh, chain link fence, vibrating screen wire mesh, fiberglass mesh, U type wire, PVC coated wire, wire mesh fences, expanded metal, perforated metal and various wire products.       Dongshengyuan products are widely used in petroleum, rubber, building, auto industry, sifting of grains, filtration of air and liquid, etc. We export to USA, Germany, South Korea, Belgium, and Southeast Asian countries and have established long-term and friendly business relationship with our foreign customers.       We have full range of production equipments, advanced technology, scientific management and inspection system and we can meet the exact requirements of our customers for various wire mesh products. {tag}   {tag}
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628