11/0.433 KV distribution transformer /furnace transformers
11/0.433 KV distribution transformer /furnace transformers
11/0.433 KV distribution transformer /furnace transformers
11/0.433 KV distribution transformer /furnace transformers
11/0.433 KV distribution transformer /furnace transformers
11/0.433 KV distribution transformer /furnace transformers
11/0.433 KV distribution transformer /furnace transformers
11/0.433 KV distribution transformer /furnace transformers

1 / 6

11/0.433 KV distribution transformer /furnace transformers

Get Latest Price
Send Inquiry
Model No. : HS-6kV
Brand Name : YUANGUANG

Product description

  Product Description 1.Pictures Of  Furnace transformers  2.Descriptions Of  Furnace transformers
furnace transformer   electric arc furnace transformer   electric transformer 
1 Furnace transformers are separated with normal power transformer with its characteristic of massive secondary currents. 
2  Arc furnace transformers used for steel-smelting 
3 including load ratio voltage regulator type, no-load voltage regulator type,and built-in reactor type
4 Blast furnace transformers used for semlting of iron alloy, silicides, calcium  carbide
5 single phase, three phase, load ratio voltage regulator and no-load voltage regulator
6 All are energy-saving products with low power loss. 
7 Furnace transformers cooling modes are  self-cooling mode,   forced water cooling mode.
  you may like 3. More Products To Choose          power transformer                  oil immersed transformer            furnace transformer        power transformer     Pad-mounted Transformer           dry type transformer           distribution transformer         transformer substation      4. Product Structure Diagram And Quality Control     Technical Parameters 5.Technical Parameters Of  Furnace transformers Arc furnace transformers Main Technical Parameters for HS, HSZ, HSSPK, HSSP, HJSSP HJSSPZ Series 6kV-11kV Level Arc furnace transformer: 
Type

Rated

power
(kVA)

Connection
 symbol

Primary

voltage
(kV)

 

Secondary

Voltage
(v)

Regulation

voltage

step

short-circuit

impedance(%)

No-load 

loss

On-load 

loss

HS-650/10 650 D-Y,d0-11 10 130~75 5 20 1.9 10
HS-1250/310 1250 D-Y,d0-11 10 210~160 5 21 2.9 15.7
HS-1600/10 1600 Yd11 10 85~65 5 6.0 5.100 17.4
HSZ-2000/10 2000 Yd11 10 300~140 15 4/6 5.3 33.7
HSSPK-2500/10 2500 D-Y,d0-11 10 220~110 6 21/9 5.4 32.7
HS-3000/10 3000 D-Y,d0-11 10 220~110 5 19/9 5.2 26.2
HSSP-3200/10 3200 Dd0 10 240~104 5 18/7 7.7 40.9
HSSP-4200/10 4200 D-Y,d0-11 10 240~160 5 18.5 7.3 33.2
HSSP-5500/6 5500 Dd0 6 212~150 5 8 10.1 47
HSSPK-5500/6 5500 Dd0 6 260~139 8 9 7.5 60
HSSP-6300/6 6300 Yd11 6 207~158 5 7.5 8.5 58.2
HJSSP-7500/10 7500 D-Y,d0-11 10 240~140 6 6.4 10.7

78.2

HSSPZ-8000/10.5 8000 Yd11 10.5 300~140 17 7 11.8 99.8
HJSSPZ-8000/10 8000 Dd0 10 240~149 9 7.5 9.8 76.8
HSSPZ-9000/6 9000 Yd11 6 240~89 17 7 13.7 121.6
HSSP-12500/10 12500 Dd0 10 325~166 11 8 12.4 145.7
HJSSPZ-14000/10 14000 Dd0 10 325~205 13 6.5 13.2 134.6
6.Certifications And Workshop Of Product 7.Function And Features Of Product
On-load-tap-changing Electric Arc Furnace Transformer  
1)Low loss 4)High efficiency  7)Pretty outline and compact structure
2)Low noise 5)Easy maintenance 8)100% guaranteed no leakage
3)Operation reliability 6)Low partial discharge 9)Strong mechanical strength and short-circuit with
 
Electric Arc Furnace Transformer Introduction to Products
1 Furnace transformers are separated with normal power transformer with its characteristic of massive secondary currents. 
2  Arc furnace transformers used for steel-smelting 
3 including load ratio voltage regulator type, no-load voltage regulator type,and built-in reactor type
4 Furnace transformers used for semlting of iron alloy, silicides, calcium  carbide
5 Load ratio voltage regulator and no-load voltage regulator
6 All are energy-saving products with low power loss. 
7 Transformers cooling modes are self-cooling mode, forced water cooling mode.
8.Installation And Packing Of Product   Our Services 9. Our Best Service For You
1. Pre sale service
a. make technical solution
b. send quotation, technical data sheet and drawing
c. prepare power transmission plan, testing plan,and shipment plan
2. In sale service
a. supervise the manufacturing schedule totally in accordance with the plan
b. send photos to customer during every manufacturing process(hold point)
c. inform the customer one week before testinng.
3. After sale service
a. installation and commissioning, training the workers
b. quick response within 12 hours any time
c. provide 12 months gurantee period normally.
  Company Information 1.Our Company And Customers 2.Welcome To Contact Us   FAQ 3.FAQ For You
1. Q: What is your delivery time ?
A:  Depend on the type of transformer.
2. Q: What is your payment term?
A:  30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
3. Q: What kind of starndard you follow?
A:  IEC, ANSI, CSA, GB, etc
4. Q: What kind of supporting documentation you can provide normally
A:  Quotation,outline drawing,manufacturing plan, quality control plan
testing plan, financial report, type test report(KEMA, CESI),reference list,etc
5. Q: What is your normal wanrranty period?
A:  12 months after transformer operation.
6. Q: Can u do installation and commissioningin user's site?
A:  Yes, we can send our installation team to user's country for service.
7. Q: Do you have any experience in this kind of transformer?
A:  Yes, we can provide reference list for check.
8. Q: Are you manufacturer or trading company?
A:  Manufacturer and Trading company.
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628