1 / 6
Model No. : | HS-6kV |
---|---|
Brand Name : | YUANGUANG |
Product description
furnace transformer electric arc furnace transformer electric transformer | |
1 | Furnace transformers are separated with normal power transformer with its characteristic of massive secondary currents. |
2 | Arc furnace transformers used for steel-smelting |
3 | including load ratio voltage regulator type, no-load voltage regulator type,and built-in reactor type |
4 | Blast furnace transformers used for semlting of iron alloy, silicides, calcium carbide |
5 | single phase, three phase, load ratio voltage regulator and no-load voltage regulator |
6 | All are energy-saving products with low power loss. |
7 | Furnace transformers cooling modes are self-cooling mode, forced water cooling mode. |
Type | Rated power | Connection symbol | Primary voltage
| Secondary Voltage | Regulation voltage step | short-circuit impedance(%) | No-load loss | On-load loss |
HS-650/10 | 650 | D-Y,d0-11 | 10 | 130~75 | 5 | 20 | 1.9 | 10 |
HS-1250/310 | 1250 | D-Y,d0-11 | 10 | 210~160 | 5 | 21 | 2.9 | 15.7 |
HS-1600/10 | 1600 | Yd11 | 10 | 85~65 | 5 | 6.0 | 5.100 | 17.4 |
HSZ-2000/10 | 2000 | Yd11 | 10 | 300~140 | 15 | 4/6 | 5.3 | 33.7 |
HSSPK-2500/10 | 2500 | D-Y,d0-11 | 10 | 220~110 | 6 | 21/9 | 5.4 | 32.7 |
HS-3000/10 | 3000 | D-Y,d0-11 | 10 | 220~110 | 5 | 19/9 | 5.2 | 26.2 |
HSSP-3200/10 | 3200 | Dd0 | 10 | 240~104 | 5 | 18/7 | 7.7 | 40.9 |
HSSP-4200/10 | 4200 | D-Y,d0-11 | 10 | 240~160 | 5 | 18.5 | 7.3 | 33.2 |
HSSP-5500/6 | 5500 | Dd0 | 6 | 212~150 | 5 | 8 | 10.1 | 47 |
HSSPK-5500/6 | 5500 | Dd0 | 6 | 260~139 | 8 | 9 | 7.5 | 60 |
HSSP-6300/6 | 6300 | Yd11 | 6 | 207~158 | 5 | 7.5 | 8.5 | 58.2 |
HJSSP-7500/10 | 7500 | D-Y,d0-11 | 10 | 240~140 | 6 | 6.4 | 10.7 | 78.2 |
HSSPZ-8000/10.5 | 8000 | Yd11 | 10.5 | 300~140 | 17 | 7 | 11.8 | 99.8 |
HJSSPZ-8000/10 | 8000 | Dd0 | 10 | 240~149 | 9 | 7.5 | 9.8 | 76.8 |
HSSPZ-9000/6 | 9000 | Yd11 | 6 | 240~89 | 17 | 7 | 13.7 | 121.6 |
HSSP-12500/10 | 12500 | Dd0 | 10 | 325~166 | 11 | 8 | 12.4 | 145.7 |
HJSSPZ-14000/10 | 14000 | Dd0 | 10 | 325~205 | 13 | 6.5 | 13.2 | 134.6 |
On-load-tap-changing Electric Arc Furnace Transformer | ||
1)Low loss | 4)High efficiency | 7)Pretty outline and compact structure |
2)Low noise | 5)Easy maintenance | 8)100% guaranteed no leakage |
3)Operation reliability | 6)Low partial discharge | 9)Strong mechanical strength and short-circuit with |
Electric Arc Furnace Transformer Introduction to Products | |
1 | Furnace transformers are separated with normal power transformer with its characteristic of massive secondary currents. |
2 | Arc furnace transformers used for steel-smelting |
3 | including load ratio voltage regulator type, no-load voltage regulator type,and built-in reactor type |
4 | Furnace transformers used for semlting of iron alloy, silicides, calcium carbide |
5 | Load ratio voltage regulator and no-load voltage regulator |
6 | All are energy-saving products with low power loss. |
7 | Transformers cooling modes are self-cooling mode, forced water cooling mode. |
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan,and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testinng. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months gurantee period normally. |
1. Q: | What is your delivery time ? |
A: | Depend on the type of transformer. |
2. Q: | What is your payment term? |
A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: | What kind of starndard you follow? |
A: | IEC, ANSI, CSA, GB, etc |
4. Q: | What kind of supporting documentation you can provide normally |
A: | Quotation,outline drawing,manufacturing plan, quality control plan testing plan, financial report, type test report(KEMA, CESI),reference list,etc |
5. Q: | What is your normal wanrranty period? |
A: | 12 months after transformer operation. |
6. Q: | Can u do installation and commissioningin user's site? |
A: | Yes, we can send our installation team to user's country for service. |
7. Q: | Do you have any experience in this kind of transformer? |
A: | Yes, we can provide reference list for check. |
8. Q: | Are you manufacturer or trading company? |
A: | Manufacturer and Trading company. |
Send your inquiry to this supplier